ADD A NEW IDEA

Pinned ideas

PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 225 of 1130

Primavera P6 v21 compatibility with Bentley Synchro 4D

I am trying to synchronize my Primavera P6 schedule using Synchro 4D Pro, but I am facing an issue. I am using Primavera P6 version 21, which is not supported by Synchro 4D Pro. Synchro 4D Pro only supports Primavera P6 versions 19.2 or lower. I'v...
Ankit Rai 22 days ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0

Setting for appearance profile behavior for overlapping tasks

When there is one resource assigned to multiple overlapping tasks the behavior regarding which profile should be shown is not consistent. This idea adds a setting that would make it consistent. This is how the setting should work: Scenario 1 Given...
Tom Fry 22 days ago in SYNCHRO 4D Pro 1

Navisworks Exporter - Limit User Fields like the Revit Exporter

The .spx exporter in Revit has the ability to limit the number of Userfields exported from Revit. I think it would be a great idea to have the same function built into the Navisworks Exporter. Currently, it exports all Userfields and values and th...
Preston Williams 24 days ago in SYNCHRO 4D Pro / Microstation/Revit/Navisworks Plugins 0

Collapse Up / Collapse Down Function & Keyboard Shortcut in Tables (Resources, 3D, Activity)

We would like to be able to quickly jump up or down in the hierarchy of the various tables in Synchro 4D. Ctrl + [ to collapse up one level Ctrl +] to expanded down one level Ctrl +- to collapse all Ctrl + = to expand all For example: An activity ...
Mike Ranney about 1 month ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 0

Reflect simultaneous activities with different locations in a 4D animation

In road projects where there are different sections and different construction elements in which there are several tasks occurring at the same time in different locations, I would like to reflect simultaneous tasks with different locations in a 4D...
Sergi Ferrater about 1 month ago in SYNCHRO 4D Pro / Animations 0

The method to define separator used in automatching rule must be refined

When a separator is defined anything that is written in the separator option is considered a separator. This becomes an issue when the client uses one of the separators while defining element code or task code. The rule doesn't work properly. Exam...
Jerry David Jaypaul about 2 months ago in SYNCHRO 4D Pro 2

Activity Code Descriptions in the Scheduler

Primavera P6 allows for viewing activity code descriptions for grouping tasks rather than just the activity code. The activity code is usually a batch of symbols due to P6'es character limits for activity codes and that makes it a real pain in Syn...
Patryk Makowski about 2 months ago in SYNCHRO 4D Pro / SYNCHRO Scheduler 6

Batch load/unload 3D objects by filters

The issue described here: https://communities.bentley.com/products/construction/f/synchro-construction-forum/255742/synchro-4d-pro---unload-3d-objects-by-multiple-filters I would consider utilising the Filters tab in 3D View properties window for ...
Patryk Makowski about 2 months ago in SYNCHRO 4D Pro / Filters/Tables 0 Likely to implement

% Complete calculated consistenly with Physical Quantities

In SYNCHRO, despite is possible to calculate progress of leaf activites through Physical Quantitities, their "father" activities are still calculated by Duration (as their children progress is calculated by Automatic/Duration). % Complete of non-l...
Gabriele Barone 2 months ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Likely to implement

Note Component

I think it is good if we can add a Note, that exact like looks like Footnote that we already have. But with some modification. Without the Arrow Line. Not need to tag to any location or component. Can be assigned to a Activity, so we can set the n...
Indrawan Wijaya 4 months ago in SYNCHRO 4D Pro / Animations 0