Pinned ideas

PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 257 of 1337

Open a PlantSight Project into Synchro 4D Pro similar to Infrastructure cloud project

Please see attached image for details
Rodney Mascarenhas 26 days ago in SYNCHRO 4D Pro / Integrations 0

[Copy] Keep "Alerts" Populated

It would be a HUGE quality of life upgrade if Alerts did not disappear when something is changed in the schedule. We work down through that list of alerts to ensure our "Schedule Log" is clean and after every "fix" it disappears. If the behavior c...
Maria Protasova about 1 month ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Form interface in 4D should upto date with Form capability

Not all Form Capability is shown in the 4D. Example. The Default Value are not showing in 4D when we create a new form. Regards, Indrawan
Indrawan Wijaya about 1 month ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0

iModel colour in Synchro 4D

Let's say that we publish a revit model as iModel in Synchro Control Currently, in iModel, there are a few render modes as below: "Modeling" mode, corresponding to "realistic" visual style in Revit, which display material texture (e.g, earth, conc...
Khai Nam Hoang about 2 months ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0

Allow importing multiple resource statuses on the same date.

This is common when Users are importing statuses from another statusing software - they run the import weekly, while there may be multiple status updates against the same resource in the past week, and they don't have the data of when the update w...
Johannes Yu about 2 months ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 2

It is recommended to include Earned Schedule (ES) as a complement to earned value metrics.

Earned Schedule (ES) is a powerful method that helps the executive, program manager, project manager, and other stakeholders in managing projects, programs, and portfolios more effectively. ES allows EVM metrics to be transformed to time or durati...
JOSE ROBERTO GUERRERO MELO 2 months ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0

Improve cost codes (from Modeler) in 4D Pro

Cost Codes in 4D Pro The cost code information comes in the following format, which is not usable at all. How do I aggregate the quantities at Task level? One suggestion could be to have the following setup - User Field Value Cost Code 1 23560.1 C...
Arpit Prakash 2 months ago in SYNCHRO 4D Pro / Cloud-hosted Control projects / Import/Export 6

3D grid from design in Synchro

In the design models, grids are always used. For the geographical indication. It would be nice to take over these axes in a similar way from the design software in Synchro. Not as a 3D object. But as a grid where the numbers or figures are easy to...
Martijn Querner 4 months ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0

Fragments 2.0

Good afternoon, could you please add into fotmal list .frag file format to be imported? It is big data in small package a lot faster than IFC with all metadata.
Lenka Padysak 4 months ago in SYNCHRO 4D Pro / Import/Export 0

Timescale settings

Your timescale settings are not saved well enough now. After a crash or deletion of the temp files of cloud projects you have to set the timescale settings. It is better if these settings are saved for users in the project, so that it is correct ...
Martijn Querner 4 months ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0