Instead of relying on exports to single excel spreadsheets have a connection to Power BI directly to quickly view data generated for cost code assignments into customized dashboards to organize data automatically. This can make setting up estimate...
David Gallaher
over 1 year ago
in SYNCHRO Modeler
0
Future consideration
Improve naming of split objects created by Modeler
Currently names of the 3d objects are not informational and cause inconvenience for distinguishing them. Instead of naming all of them WorkAreaDetailingElement, it may be better to name this split objects by concatenating the inherited original ob...
Jacqueline Chen
almost 4 years ago
in SYNCHRO Modeler
7
Future consideration
Add cost codes within modeler tree and have capability to export cost code configuration.
The default format of setting up a cost code configuration to attach to a model is too rigid. It is almost impossible to determine which codes will need to be incorporated for a design build project model. As designers update models more codes wil...
David Gallaher
over 1 year ago
in SYNCHRO Modeler
0
Future consideration
Current way to delete cost code is by a single element. Need the capability to reassign multiple or delete to maximum time. It would be frustrating to delete and then reassign codes if there are thousands of elements.
David Gallaher
almost 2 years ago
in SYNCHRO Modeler
0
Future consideration
When errors are made in cost code assignments it is cumbersome to go back a review the entire model. Having an audit trail feature will pinpoint all actions made, when they were made and by whom to expedite remedying issues. It also will assist in...
David Gallaher
over 1 year ago
in SYNCHRO Modeler
0
Future consideration