Ability to select and move multiple pages in plan set config
We update plan sets as new sheets are prepared. These may not necessarily fall in sequence after the existing sheets, which is where all drafh sheets land by default. So we have to move 50-100 sheets to their correct location in the set. Currently...
Include a direct hyperlink to the specific Activity page from the Export Activities file
Our project team will frequently use the exported activities file for further analysis or comparison with other data for cross-checking, without the need to copy the activity ID and search for that in the filter, a direct link to the specific Acti...
Give users the ability to change colors of issues flags based on a form type, status type, or user setting. This helps to give quick view of most urgent issues.
With user-defined tags, users can better organize, sort, and communicate the purpose and nature of a project instance. For example, a project instance can be used as a what-if scenario, which will be easier to sort with a what-if tag.
Improving behavior in SYNCHRO Filtering on Work Screen
Current Filtering Behavior in SYNCHRO Work Screen At present, when users attempt to filter on the Work Screen in SYNCHRO, they must manually click back into the white input box (e.g., next to "Closed") for the filter to activate. This behavior is ...
Ability to opt out of Form notification for specific status
Some users being sent notifications based on their role may not want to get notifications for certain statuses of a form workflow. This can apply to all the form instances in a form def. or just to a specific form instance, that may not be relevan...
Provide an integration with the screen capture capability of a mobile device to save captures to Field Documents folder or connected PW folder. Current workflow of user takes a screen capture then must go into device gallery and manually move scre...
Options to customize the table part of the Gantt window accessible from Synchro Control \ Schedule
Necessary to have the possibility to view in 4D Review the same layouts as those which have been defined in Synchro Pro.
These layouts must include :
- Schedule Tasks Group and Sort,
- Schedules tasks filters,
- Relevant Schedule Tasks Attrib...