Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Search results

Showing 29 of 29

Auto-populate secondary cascading list dropdown's when only one option is available

It would be nice to be able to remove 2 unnecessary clicks. Lists are as follows First List > Second List1 > A 1 > B 1 > C 1 > D 2 > E 3 > F 4 > G 4 > H On the First List, when selecting 2 or 3 we would like to remove th...
Caitlin Zeuli almost 4 years ago in SYNCHRO Control / Forms 1 Future consideration

Combine Forms

Combine Form 1, Form 2, and Form 3 into one comprehensive report for that day. The Contractor’s Daily Report: Foreman Daily Record Foreman 1 Foreman 2 Foreman 3 Quality Inspector Daily Record Inspector 1 Inspector 2 Inspector 3 Safety Inspector Da...
Guest about 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Give Project Admin More Control over Forms

1. Allow Project Admins/Project Owners/Document Controller to Delete Forms created in error in progress 2. Allow admins to download a list of all Bindings. 3. Delete Binding Created by Administrator4. Have a separate Test Area in Control, within t...
David Dudek Jr. over 2 years ago in SYNCHRO Control / Admin / Forms 0 Future consideration

Add more options to "Quantities"

projection area to 3 planes surface area with plane option (XY+XZ+YZ)/2 or XY+XZ+YZ XZ+YZ... etc
Shaohua Guan almost 4 years ago in SYNCHRO Modeler 0 Needs review

Incorporation of an "Undo" feature within the measurement tool

incorporate an "undo" button while you are using any of the civil tools. For example, being able to use the "station/Offset" tool 10 times and only "undoing" the last 3 measurements taken instead of all the 10.
Tony Bonacorsi almost 2 years ago in Field / Models | Tools 1 Future Consideration

Ability to flag Events as "Non-Bookable"

It is possible to flag an Activity as Non-Bookable so that a user cannot book usage against it. This change would allow this feature to be extended to Events
Luke Read over 3 years ago in EVM (Perform) / Events & Notices 0 Shipped

Include GUIDs in cost code assignment summary export

Currently after user completes the cost code assignments in Modeler, the export/ summary does not necessary provide the GUIDs for the elements, therefore consultants or services colleagues don't have a way to bring cost codes to 4D Pro unless Mode...
Jacqueline Chen over 4 years ago in SYNCHRO Modeler 0 Planned

Issues on grouping WBS schedule in Synchro

I have encounter issues when I want to group my WBS based on work package then followed by WBS Name in Synchro My original schedule is based on Image 1 (From Left) When I did the grouping in Synchro (Image 2 and 3), it showed WBS workpackage follo...
Nabila Shahilla over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Future consideration

Synchro 4D Pro Gantt and EVM configuration improvement

As per Arpit's response, none of the features required below are possible in Synchro, it would be a meaningful improvement if Synchro aspires to be a tool to be used for construction/planning management rather than only 4D: Hi, I'm trying to do so...
Rafael Vendrame over 1 year ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0

Default Edge Colour

Hi Jacqueline and Kate, I will also try to explain what is the issue and what we would like to have. If we don't manually override the colour of the objects or don't use 3D View Properties > Color Mode > 3D Filters, then the edges are shown ...
Guest about 4 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Shipped