Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Search results: SYNCHRO 4D Pro

Showing 17 of 61

The method to define separator used in automatching rule must be refined

When a separator is defined anything that is written in the separator option is considered a separator. This becomes an issue when the client uses one of the separators while defining element code or task code. The rule doesn't work properly. Exam...
Jerry David Jaypaul about 1 year ago in SYNCHRO 4D Pro 2

Add User field Drop down list feature

Further to our Customer suggestion, it would be very usful to have a Drop down list feature for User defined Field. It could be the list with the values to be selected from the same formula in the field value, or (to save ASCII script text) is ref...
Pavel Khrapkin almost 3 years ago in SYNCHRO 4D Pro 0

Multiple Colour Modes In 1 3D View

Being able to have multiple colour modes in 1 3D view will be very helpful as it allows you to be able to fully customize your outputs. An example of where this is useful could be showing the different pouring stages of concrete using activity tra...
Daniel Clayson over 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Will not implement

Undo feature (not rollback)

There is a lack of an "Undo" feature. In P6 we are able to go back if something was keyed in incorrectly. A rollback is not always practical. We would like the application to allow for 1-3 user undo requests.
Jason Summers over 3 years ago in SYNCHRO 4D Pro 0 Will not implement

Ability to filter by WBS and Path

A good WBS is the core to most schedules and the ability to quickly filter by WBS levels or groups is a much used feature in P6 and other scheduling tools I would like to do in Synchro. The current work arounds I use are 1) Manually select the des...
Kristina Henkai over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Synchro 4D Pro Gantt and EVM configuration improvement

As per Arpit's response, none of the features required below are possible in Synchro, it would be a meaningful improvement if Synchro aspires to be a tool to be used for construction/planning management rather than only 4D: Hi, I'm trying to do so...
Rafael Vendrame 12 months ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0

Issues on grouping WBS schedule in Synchro

I have encounter issues when I want to group my WBS based on work package then followed by WBS Name in Synchro My original schedule is based on Image 1 (From Left) When I did the grouping in Synchro (Image 2 and 3), it showed WBS workpackage follo...
Nabila Shahilla about 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Future consideration

A New Task Filter Allowing You To Filter Based On Assigned Resources

We require this feature because we need a quick way of filtering tasks without/with any resources assigned after doing a programme synchronisation. Currently the only way to do this is by filtering the resources manually, however, when you import ...
Daniel Clayson over 3 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

Setting for appearance profile behavior for overlapping tasks

When there is one resource assigned to multiple overlapping tasks the behavior regarding which profile should be shown is not consistent. This idea adds a setting that would make it consistent. This is how the setting should work: Scenario 1 Given...
Tom Fry about 1 year ago in SYNCHRO 4D Pro 1

Easier way to export frames with timeline

User is working on a large project and it is a requirement for them to export 4D snapshots from different areas using the same animation timeline. In one animation, they have timeline generated with weekly keyframes, and they need to export a set ...
Guest over 4 years ago in SYNCHRO 4D Pro / Animations 1 Future consideration