Just like the time period filter for activities it would be helpfull to be able to get the view of all these avtivities in the 3D window, including all assigned equipment resources. So not just a Focus Time, but a Focus Period. This would be very ...
Drop down option to allow more than 25 forms to be viewed per page.
Our current Projects involve approximately 250+ forms of each type to be completed for installed asset inspections. the ability to have a drop down option at the bottom of each page with options to view 25, 50, 100 or 500 forms at any time without...
we should be able to create work packages from Synchro 4D pro (via Resource Groups) and see them in the list of work packages in Control. At the moment these two lists are not he same. At the same time, the status update should be available in the...
Francesco Nacci
over 3 years ago
in SYNCHRO Control / Forms
0
Future consideration
I think if the timeline graphic looked better and more up-to-date, at the minute it looks a little more old-school. So I think this would help Synchro Exports looks more professional and lessens the need for external/third party software.
Reference Other Synchro 4D Projects without Importing Them
Where multiple projects are underway across a large campus, often run by separate teams or other contractors, it would be beneficial to be able to reference these as links to a Synchro Project, as opposed to importing them. This would enable other...
We can customize the Forms page summary to include any attributes we want which is great, but the second we close and open Control we lose the customization. It would be easier if we can retain the customization. Even more, what if we can define t...
Alexandru Buzan
over 3 years ago
in SYNCHRO Control / Forms
1
Future consideration