Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1342

Station offset to overlay with map

Watch this season plan activity: PDCGTM-436Vincas It is a competitor https://instacei.com/home InstaCEI - Highway Construction SoftwareThe essential software for highway construction. Collect, share and act on data real-time from any device, all i...
Jacqueline Chen over 4 years ago in Field / Models | Tools 0 Will not implement

Truncate Section size for hidden Controls

I have a few Controls under each line item, that are hidden on load, but the Section size does not truncate itself to account for that. The blank space is accommodating for all hidden Controls.
Arpit Prakash about 2 years ago in SYNCHRO Control 0 Future consideration

Display a time period in 3D window

Just like the time period filter for activities it would be helpfull to be able to get the view of all these avtivities in the 3D window, including all assigned equipment resources. So not just a Focus Time, but a Focus Period. This would be very ...
Michiel Janssens over 4 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Future consideration

Merging work packages

we should be able to create work packages from Synchro 4D pro (via Resource Groups) and see them in the list of work packages in Control. At the moment these two lists are not he same. At the same time, the status update should be available in the...
Francesco Nacci over 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Change term "Break Duration" to "Unpaid Break Durations"

The functionality of the "Break Duration", particularly in the App is to reduce the paid period and therefore should be more clearly identified as an unpaid period to avoid inclusion of paid break durations and thereby having these periods wrongly...
Ernest Downes about 2 years ago in EVM (Perform) / SYNCHRO Perform Mobile 1 Future Consideration

Under the Documents Module Keyword Search does not work

When I type in the field to do a keyword search, it does not return results based on a keyword
Derryl Acosta over 4 years ago in SYNCHRO Control / Documents 1 Future consideration

Forms page summary - customization

We can customize the Forms page summary to include any attributes we want which is great, but the second we close and open Control we lose the customization. It would be easier if we can retain the customization. Even more, what if we can define t...
Alexandru Buzan over 4 years ago in SYNCHRO Control / Forms 1 Future consideration

Changing Assigned To using Scripts behaves differently from manual selection

I created a script to change Assigned To based on another binding. In the following, when I select A for the first time, the Assigned to changes to Arpit Test, and Send for Review transition reflects that as well - However, I get a notification th...
Arpit Prakash about 2 years ago in SYNCHRO Control 0 Planned

Support Azure Maps in Korea

Azure Maps service is not supported in South Korea.
HoSang Jeon over 4 years ago in SYNCHRO Control / Maps 0 Will not implement

Ability to create mapping to a fillable Form using Excel

A lot of the fields may be similarly named, and our system doesn't automatically map them. It has to be done manually, and it can become cumbersome for a large Form. Esp. because if we create a copy of the Form, the mapping does not get copied.
Arpit Prakash about 2 years ago in SYNCHRO Control / Forms 1 Future consideration