Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Field

Showing 117

Add a "Critical Path" icon to those objects who have critical path activities associated with them

I feel this would be helpful for users in the field to see if a model object is associated with a critical path schedule activity.
Philip Breeden over 1 year ago in Field / Models | Display 1 Future Consideration

Control task visibility for specific users

Currently there is an option in the Field App to see your tasks and everyone's tasks (when updating statuses). Would it be possible to have access levels or permissions to regulate what tasks users can see/edit apart from just assigning specific t...
Philip Breeden over 1 year ago in Field / Status update | Tasks 4 Future Consideration

Model Not Appear When we do Resource Progressing

When we do resource progressing, and if we have a Removing Activity, the component geometry is not appear. We need to set the timeline to the task date so we can see the geometric. To help user easily get the timeline for that task, it is good to ...
Indrawan Gmail about 3 years ago in Field / Status update | Resources 2 Already exists

When object is selected it highlights tasks associated (Status update view)

When 3D odject is selected in Status view the accosiated task should be highlighted. Similar to when a 3D object is selected in the schedule view in Control.
Thomas Schimpf over 3 years ago in Field / Status update | Resources 0 Planned

Downloaded Document

at Downloaded Document, it has Delete button. Actually this delete button will delete the file in Control Document. This can make user miss understand the purpose of this button. Need to have better description for the Delete button and for the Re...
Indrawan Wijaya over 3 years ago in Field / Documents | Documents 0 Planned

Form Model location should include visibility

Model location should include selection, visiblity, view, basically Model location should behave like Saved View.
Jacqueline Chen over 3 years ago in Field / Models | Display 0 Will not implement

Station offset to overlay with map

Watch this season plan activity: PDCGTM-436Vincas It is a competitor https://instacei.com/home InstaCEI - Highway Construction SoftwareThe essential software for highway construction. Collect, share and act on data real-time from any device, all i...
Jacqueline Chen over 3 years ago in Field / Models | Tools 0 Will not implement

Add Fields to Status Updates

We are trying to track quantities of units installed by our field personnel. It would be great if they could status the task then enter the quantity of material installed. It would be nice if there was a comments field added as well so they could ...
Guest over 3 years ago in Field / Status update | Resources 1 Planned

Task progressing

Allow users with proper RBAC Scheduling permissions (read/write for task actuals) to status Tasks - Set status to Started or Finished. For task status set to Started - let user input Actual start date and time, % complete For task status set to Fi...
Jacqueline Chen almost 4 years ago in Field / Status update | Tasks 1 Planned

Selecting/Filtering Element Based on MetaData/User Field Search during Status Update in SYNCHRO Field.

Sometimes, it becomes very tedious to select the right 3D resource manually during Status Update. For example, selecting a pile based on 'Pile Number' user field would be a lot easier than just manually selecting the 3D object on the screen among ...
Anik Mal about 2 years ago in Field / Status update | Resources 1 Future Consideration