Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 493

Add support for BCF

https://en.wikipedia.org/wiki/BIM_Collaboration_Format
about 5 years ago in SYNCHRO 4D Pro / Integrations / SYNCHRO Open Viewer 3 Future consideration

Ability to move files seamlessly between PW and Control > Documents

No description provided
Arpit Prakash over 1 year ago in SYNCHRO Control / Documents 0 Future consideration

Ability to bulk update Document Folder Access

Currently, the way this is set up is to remove access for one Role, all other Roles need to be given access, by manually checking on each. If we had a bulk update option, it will be easier to simply remove the restricted users.
Arpit Prakash over 1 year ago in SYNCHRO Control / Documents 0 Future consideration

Ability to receive periodic reports of Forms assigned to a user

Admin should be able to specify which Form types should be part of a daily report, that gets sent out periodically to the assigned users.
Arpit Prakash over 1 year ago in SYNCHRO Control / Reports 0 Future consideration

Connection between the form document number and Synchro ID column

Having the form document number and Synchro ID column the same is beneficial to each project member as they do not need to open each file to check on what they are looking for. They can straightaway see it from the ID column listed. During form c...
Kimberly Nazareth Angeles almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

To apply to the 3D Window of Synchro Control \ Schedule the same 3D Filters than the one(s) activated at the time of the upload of the .sp file.

As an example, User would like to filter all 3D Objects not assigned to a Schedule Task (through corresponding Material Resources) prior to share the .sp file with stakeholders of the project through Synchro Control \ Schedule, so that unmapped 3D...
Thibault Dumas almost 3 years ago in SYNCHRO Control / Models 0 Future consideration

Add basic ability to markup uploaded images/photos

It would be useful to be able to: Take image with your mobile have ability to add notes, text have ability to add simple markup e.g. line, circle, rectangle been able to choose the colour of the shapes, font Case scenario: Reinforcement cage is de...
Kiril Tasev almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

ISO 19650 Compliance

It appears that your are not able to use ISO 19650 compliant numbering and that your numbering style still following a very basic 30 year out style of numbering. Please re-code and rectify this asap.
Keith Anthon almost 2 years ago in SYNCHRO Control / Forms / Plan Sets 0 Future consideration

Add more data type to cascading list

Cascading list currently supports only text data type. More data types (number, boolean, dates) should be added so that the cascading list can interact more with Actions.
Shaohua Guan 12 months ago in SYNCHRO Control / Forms 0 Future consideration

Add Related and Escalate Option in Field App

Add Related and Escalate Option is not available in Field App. If we are asking our Contractor to raise Inspection with supporting checklist to complete inspection. Due to lack of this feature, we have to provide him Syncho Control License and it'...
Sachin Sharma over 3 years ago in SYNCHRO Control / Inspection 0 Future consideration