It would be great if Synchro would be able to generate a report that allows to incorporate the 3D model with the tasks or the 3D model with the resource status. I know we can use synchro open viewer or control to see those together, but it would s...
I have noticed that when I use the subdivision tool on a object. The object does not change the color if it assigned to a resource status. It defeats the purpose of resource status tool cause I can't see the status of that object if it is subdivid...
Give Option for " Animation Export to GLB, glTF and USDZ Format" (For Augmented Reality)
Above mentioned format is supporting direct way of Augmented Reality so, This Export option is useful to show the 4D model Simulation in AR Web/App Viewer
Having individual 3D filters by selection per Control user. If you isolate or hide any 3D data in a Control project Synchro 4D Pro automatically activates the 3D Filter "3D by Selection [Administrator]". We are working simultaneously on Control pr...
A search tool in the Form Designer where one can input part ot whole name of a control or Binding and system then highlights or focuses on that control within the form. Additional information: I was looking at future functionality similar to searc...
In the Description section in Event (Mobile app) it would be great if we can have Pre-filled Template so I want the user to have a set list of details to fill in for the description for consistency.
If new elements are added in 3D model for which resources have been created in Synchro 4D pro. There must be option to recreate the existing resources without breaking the links and maintaining the hierarchy as per the 3D model.
Based on Project Schedule, allocated manpower and site field tracked Material utilization to find individual or team manpower Productively data. This data useful for further planning in similar work and find good team for productivity. Example:Own...
ASHWIN RAJESH K
over 1 year ago
in Perform
1
Future Consideration