Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 254

Be able to add GeoTIFF or place images as textured plane on coordinates

Being able to do this would improve the current workflow (manual placement of textured plane on a 2D raster that is imported as 3D) Improvement in Quality (exact placement) Improvement in efficiency (no manual placement)
Bram Wildekamp over 3 years ago in SYNCHRO 4D Pro / Import/Export 2 Future consideration

3D View Focus Time Date - Display First Day of Week

This is useful because we would like to be able to show the week commencing date in the 3D view focus time. Currently we set the project focus time to the end of each week (Sunday) in order to capture all the activities happening, however this mea...
Daniel Clayson over 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Future consideration

Undo feature (not rollback)

There is a lack of an "Undo" feature. In P6 we are able to go back if something was keyed in incorrectly. A rollback is not always practical. We would like the application to allow for 1-3 user undo requests.
Jason Summers over 3 years ago in SYNCHRO 4D Pro 0 Will not implement

Physical Quantity distribution in Task Usage

It would be very helpful to see a physical quantity, its cost (or task cost) and their distribution in the "task usage report"
Varvara Kleshchevnikova over 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Synchro_Resource Leveling/takt planning

Myself, a synchro user from Germany.I have developed a 4D BIM simulation with concrete quantity forecast in my new project .Now I would like to do a Resource levelling or takt planning.The peak demands needs to be balanced .Is there any solution a...
Guest over 4 years ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Future consideration

Material Texture Option

photo texture/ texture to model- images mapped to the surface of model for realistic material.
ASHWIN RAJESH K almost 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 1 Already exists

Ability to filter by WBS and Path

A good WBS is the core to most schedules and the ability to quickly filter by WBS levels or groups is a much used feature in P6 and other scheduling tools I would like to do in Synchro. The current work arounds I use are 1) Manually select the des...
Kristina Henkai over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Batch Render Viewpoint

I have several 3D still images for stagings that are saved in viewpoints. Everytime i need to activate then hit the report reder in iray button. Which means I will have to wait for all of my images to be rendered one by one. We should a have a bat...
Shuo Wang over 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 2 Planned

Do Rotation Easily - 3D Object that not at 90degree position with XY axis

We have user complaining that it is difficult to do 3D if the 3D object not at 90degree position with the XYZ axis. Please check this video attached. May be by adding the Degree configuration at the Alignment can solve this one?
Indrawan Gmail over 2 years ago in SYNCHRO 4D Pro / Animations 0

Multiple Gantt charts

Hi SYNCHRO team, I have a feature request for multiple Gantt chart windows in one SYNCHRO project. In some situations I want to visualy compare multiple baselines and filtered schedules in one project. It is possible to do this with the Compare ...
Stephan Klotz over 5 years ago in SYNCHRO 4D Pro 1 Future consideration