Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1042

Option to automatically change the activity progress % to 100% when the finish button is pressed.

No description provided
Pak To Hui over 2 years ago in EVM (Perform) / Progress Measurement 1 Will not implement

An optional Dark Mode

An optional dark mode for the UI would be a nice to have feature
Guest over 2 years ago in SYNCHRO Control / Admin 1 Future consideration

Drag windows out of the way in Manage iModel

During the process of managing an iModel there are various windows that come up. Please could you add functionality for dragging these windows to a different position? For example to another computer screen. They are currently static and it would ...
Ruth Fuller over 2 years ago in SYNCHRO Control / Models 0 Planned

I want to use an Action to create a message in a Form to tell a User to do something without the "Basic HTML alert" popping up in the title of the message.

I want to use an Action to create a message in a Form to tell a User to do something without the "Basic HTML alert" popping up in the title of the message. The Message on the first line: “Construction.bentley.com Says” is meaningless to a message ...
David Dudek Jr. over 2 years ago in SYNCHRO Control / Forms 2 Will not implement

Task progressing

Allow users with proper RBAC Scheduling permissions (read/write for task actuals) to status Tasks - Set status to Started or Finished. For task status set to Started - let user input Actual start date and time, % complete For task status set to Fi...
Jacqueline Chen over 4 years ago in Field / Status update | Tasks 1 Planned

indicate the escalation info in the pdf report export if one form is escalated to another form

for example, form A is escalated to form B. When form A or form B is exported, it doesn't state the information/statement of this escalation (e.g. form A is escalated to form B) in the export PDF.
Siti Nurhazirah Mokmin over 4 years ago in SYNCHRO Control / Reports 0 Future consideration

Allow for High Res Photos to be captured in the Docket Form / Mobile App

Requested via https://envisionapp.zendesk.com/agent/tickets/6575 for QBC. Photo resolution in the docket form is significantly worse than the same photo taken within the photo and comments form
Bernhard Budiono over 2 years ago in EVM (Perform) / Dockets 1 Future Consideration

direct link between individual model elements to drawings in documents

all elements, if configured, should be linked to live documents on Control when user click on one element, it will take to the right drawing within Control. It could be a tag, an url, or simply the name of the document and stored in the section sh...
Shaohua Guan over 4 years ago in SYNCHRO Control / Models 0 Future consideration

Documents Count and Selection

Under the documents Module, User would like to see a count of the files that are selected in a folder and a count of documents under that folder
Derryl Acosta over 4 years ago in SYNCHRO Control / Documents 0 Already exists

Ability to load multiple projects through Power BI Connector

Currently, I can only load one project at a time - If i want to aggregate data from multiple projects, and I run the Connector, it will create duplicates of the existing tables with a suffix (Query1, Query2, etc.), which becomes very hard to merge...
Arpit Prakash over 2 years ago in SYNCHRO Control 0 Future consideration