Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1335

Infrastructure Cloud - Help Link only Show ProjectWise Link

When we use Infrastructure Cloud Link, and open SYNHCRO project, the Short Cut Link in top Right (just before Profile) still show ProjectWise link. I think need to change to SYNCHRO if we are opening SYNCHRO Project.
Indrawan Wijaya about 1 year ago in SYNCHRO Control / Admin 0

Schedule Filtering Option

Please add option to filter tasks by either ID or Task name, additionally include option to collapse / expend all or to level
Michael Shepherd over 3 years ago in SYNCHRO Control 1 Planned

Ability to map the date tied with a Signature control seperately to a fillable pdf

Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 0

Auto suggest existing Tags when entering a new tag when editing a Plan Sheet

As I type in a TAG for a plan sheet, if as I type there are existing tags that match the current pattern, suggest them to me. This allows me to pick from an existing tag and helps to maintain consistency avoiding typos as well as duplicate tags th...
Paul Johnson over 2 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Connection API for Asta cloud hosted projects

A number of construction projects are now moving over to cloud hosted Asta environments. Currently Synchro 4D Pro can not connect to an asta project unless you have a the standalone software and licence on the same computer. The addition of an API...
Michael Thomas over 2 years ago in SYNCHRO 4D Pro / API 0 Future consideration

Export PDF should have annotations/markups on linked project documents

It is necessary and make sense if the exported pdf has all the annotations/markups done by the team and not the original pdf linked.
Kimberly Nazareth Angeles over 2 years ago in SYNCHRO Control / PDF Markup 0

Work Roster - the ability to set fill colours against Work Roster Codes

Ability to set fill colours against the work codes for quick visual reference
Luke Read over 2 years ago in EVM (Perform) / Rosters 0 Future Consideration

Work Roster - Add comments to a cell

Ability to add a comment in to a cell e.g. On a Fly In day it would be ideal to add the flight information as a comment
Luke Read over 2 years ago in EVM (Perform) / Rosters 0 Future Consideration

A New Task Filter Allowing You To Filter Based On Assigned Resources

We require this feature because we need a quick way of filtering tasks without/with any resources assigned after doing a programme synchronisation. Currently the only way to do this is by filtering the resources manually, however, when you import ...
Daniel Clayson over 3 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

Column search/filter/sort for Schedule

This is usefull to quickly navigate a large schedule and review only the relevant information.
Arpit Prakash almost 5 years ago in SYNCHRO Control / Models 0 Planned