Add the ability to make a custom filter in Field to view tasks older than 90 days. Useful for when the schedule is made mid-project: users with a field license should be able to mark resource statuses for all tasks, even old ones.
It would be helpful to create Saved Views in 2D Views information. This way we can keep all the views in one place for navigation, and we can point to specific items or details within the 2D Views.
Ability to assign users or roles to Approvers based on conditions with script
Ability to be able to define custom conditional approvers based on parameter derived from user choice. This can be achieved for example by having a system User list ApproversList similar to AssignedUsers which can hold the required approvers. Thes...
Kiril Tasev
almost 2 years ago
in SYNCHRO Control / Forms
0
Future consideration
Drop down option to allow more than 25 forms to be viewed per page.
Our current Projects involve approximately 250+ forms of each type to be completed for installed asset inspections. the ability to have a drop down option at the bottom of each page with options to view 25, 50, 100 or 500 forms at any time without...
Uploading a ProjectWise Document Set into Control via Connections
When creating the federated model, I would like to be able to choose the Document Set containing all the 3D models which I created in ProjectWise. The Document Sets doesn't come through when I connect Control to ProjectWise via Connections.