PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1303

Contractor logo is variable as the contractor changes name

Contractor logo changes as the contractor's name change.
Kimberly Nazareth Angeles about 2 years ago in SYNCHRO Control / Forms 0 Already exists

Additional client font

Is it possible to add more font style aside from the existing fonts we have now?
Kimberly Nazareth Angeles about 2 years ago in SYNCHRO Control / Forms 0 Will not implement

Ability to Define Condition on Property Assignments during Transitions

I want to be able to define a condition for property assignments - One use case scenario is to automatically assign the Form to a User, based on a Project that was selected in the previous status.
Arpit Prakash over 1 year ago in SYNCHRO Control 0 Planned

Markup Photos

Ability to markup photos (Asked about this on demos)
Thomas Schimpf over 3 years ago in Field / Forms | Media 0 Planned

Grid control options

Grid control / Table functions needs improving, needs to function more like MS office. This tool is very difficult to use and can be very inconvenient. The grid control should also allow for limited horizontal inputs, allowing X and Y data as apos...
Ashley Edmonds over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

QR Code function

A control that allows a QR to be scanned. This would then link the QR to a document or a 3D model reference
Ashley Edmonds over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Upload plan sets from PW and documents section

Currently the workflow requires a download from the source (PW or project documents) and an upload to plan set. That leaves up to 3 copies of the same file.
Dan Sheldon over 3 years ago in SYNCHRO Control / Documents / Plan Sets 1 Future consideration

Provide ability to copy user group from Synchro into Projectwise to enable folder permissions

the Provide ability to copy user group from Synchro into ProjectWise to enable folder permissions. Currently, if a Form definition is set to output pdf to PW in transition, the PW admin will have to modify the permissions of each user individually...
Kiril Tasev 9 months ago in SYNCHRO Control / Forms 0

Add visual indicator to the PDF printout fields that have binding mapping done

hello, if a binding mapping is done for a field in the PDF printout, that field, should have some kind of indicator, indicating that itself has been mapped. please refer to the screenshot.
Shaohua Guan 9 months ago in SYNCHRO Control / Forms 0

add feature where multiple SYNCHRO to PDF binding pairs can be selected

hello, please add a feature where multiple SYNCHRO to PDF binding pairs can be selected at once. right now, only one can be selected at each time.