Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1322

Enable Direct Assignment When Reopening Forms

When reopening the form could be possible to assign that reopening directly. 
Yessica Andrade Barbosa 10 months ago in SYNCHRO Control / Forms 0

Add a Pin on a Form

There Should be a possibility to set a Control with a pin. That means when you choose it you should be able to set a Pin to save this Control Value. E.G: when you collect defects on the same level you don't need to fill the Level every time for ea...
Alexander Koenig 10 months ago in SYNCHRO Control / Forms 0

Group vs Individual Saved View share setting behaviour

If a Group has multiple Saved Views within it, and we turn on Sharing, all the views become shared. However, if another non-shared View is added to a Shared Group, that and any other subsequent Views need to be individually shared manually. At th...
Arpit Prakash about 4 years ago in [Archive] SYNCHRO 4D Review 0 Future consideration

Guest signature/approval/audit trail mark

It will be useful to have an ability for a form to be sent to external to the flow/project person as a guest/3rd party signatory. This is to enable that person to assure "yes/no" or "Accept/Reject" statement that can then be added to the form's au...
Kiril Tasev over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Incorporation of an "Undo" feature within the measurement tool

incorporate an "undo" button while you are using any of the civil tools. For example, being able to use the "station/Offset" tool 10 times and only "undoing" the last 3 measurements taken instead of all the 10.
Tony Bonacorsi over 1 year ago in Field / Models | Tools 1 Future Consideration

Enabling measurement tools to convert between different units of measure

have the ability to convert an area measured from Square Feet to Square Yards or Acres automatically with a click of a button like Google Earth's Capability.
Tony Bonacorsi over 1 year ago in Field / Models | Tools 1 Future Consideration

Multiple Colour Modes In 1 3D View

Being able to have multiple colour modes in 1 3D view will be very helpful as it allows you to be able to fully customize your outputs. An example of where this is useful could be showing the different pouring stages of concrete using activity tra...
Daniel Clayson over 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Will not implement

Synchro control add more than one project at a time

Ability to add more than one project in synchro control
Guest over 1 year ago in SYNCHRO Control / Schedule 0

Save calendar dates on saved views in synchro control

Ability to save dates ranges in synchro control whem saving vies
Guest over 1 year ago in SYNCHRO Control / Schedule 0

Importing from Revit with metric reverts unit to feet unless settings are adjusted in 3D Import dialog

There is one bug I have found, it’s an easy fix but took a while to figure out: When importing spx files from revit using the import project, it will assume the default unit as feet even though revit and synchro are both setup in metric. The way t...
Guest over 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration