Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1322

do not apply grouping colors

By default, the checkbox in Gantt Display Options is selected for "do not apply grouping colors" For us, it would be nice if this is a setting that is included in the Synchro Settings so that it is stored in the Windows registry. We can facilitat...
Martijn Querner about 1 month ago in SYNCHRO 4D Pro / SYNCHRO Scheduler 0

Layouts in control project

Layouts don't work in cloud projects now, but it's a missing essential component for working well with multiple people in the cloud.
Martijn Querner about 1 month ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0

separate 3D view selected objects

We often use the 3D subdive window not to cut objects, but to see which objects are selected. You can also use filters for this, but if you want to see the linked objects (task with assignments) for each task, setting filters is too much work ever...
Martijn Querner about 1 month ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0

Civil Design Validation and Analysis: Enable read-only view of Superelevation Analysis Result

As a user, I want to view Superelevation Analysis Results in SYNCHRO Field.
Luke Read 3 months ago in Field / Models | Tools 0 Future Consideration

Civil Frontstage: Civil Tools - Enable Drainage Info and Drainage Profile in SYNCHRO Field

As a user, I want to be able to use the Drainage Info and Drainage Profile civil tools in SYNCHRO Field, same as what is available in the Bentley Infrastructure Cloud portal.
Luke Read 3 months ago in Field / Models | Tools 0 Future Consideration

Add Work Area tag to elements automatically after creating Work Areas

No description provided
Johannes Yu 6 months ago in SYNCHRO Modeler 0 Needs review

Ability to bulk create Actions/Scripts through Excel Configuration Spreadsheet

No description provided
Arpit Prakash 11 months ago in SYNCHRO Control / Forms / Inspection 0 Planned

Email notifications showing mis-leading information

Ability to change the basic email notification sent out. Currently the email notification includes info like Created by and Created on, which COUNTERINTUITIVELY tells the user who has DESIGNED this form and WHEN IT WAS DESINGED.. instead of showin...
Irena Seleznjova 5 months ago in SYNCHRO Control / Forms 0

Ability to manually save changes in Forms Designer

When designing large Forms, the performance heavily degrades on any action like selection, editing, etc, due to auto-save continuously running in the background. This could be a toggle to enable/disable as required.
Arpit Prakash 10 months ago in SYNCHRO Control / Forms 0

Allow documents connections to different sources

Having a connection to ProjectWise is good, but consulting organizations use multiple document systems. To simplify workflows for consulting organizations with multiple documents sources working with owner/operators, contractors, other consultants...
Kerry Newbanks 5 months ago in SYNCHRO Control / Documents 0 Future consideration