Manage the continuity of forms from design to construction.

Provide continuity to the project lifecycle by generating a procedure to transfer the forms created in the Design stage (with a project created in the infrastructure cloud portal) to the Construction stage (with a project created in the synchro co...
Guest 7 months ago in SYNCHRO Control / Forms 0

As a user configuring inspections, I'd like the ability to download the inspection configuration file .xlsx I have previously loaded into SYNCHRO Control. This is so that I can correct mistakes, add more to the WBS/Spec, etc.

Any user configuring inspections will benefit from this as it allows to correct mistakes. Additionally, if the user making the adjustments is not the same as the user making the original configuration then this new user can go to SYNCHRO Control t...
Mariano Colicchio over 1 year ago in SYNCHRO Control 0 Planned

Showing all active Resources for a look ahead period

I am trying to generate look ahead prints with all active 3D resources visible for that look ahead period instead of just the active Resources of the Focus Time. Example: show all tasks in between 25th of July '22 and 21st of August '22.I would li...
Stephan Klotz over 2 years ago in SYNCHRO 4D Pro / Filters/Tables 1 Already exists

Project filtering by filters or activity codes

the goal is to filter the 4D view to today's or next week's work for the specific role based user viewing the 4D model, pref. based on activity codes, 3D or tasks filters (like SITE used to have!)
Joost Wijnen over 3 years ago in Field / Models | Display 0 Future Consideration

Option to wrap text within the task table

Option to wrap text within the task table to prevent truncated data in the view.
Jason Summers almost 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

To be able to display annotations in the 3D window accessible from Synchro Control \ Schedule.

For some Use-Cases, it can be necessary to add information to the 4D Model under the form of annotation to highlight specific items (schedule items or Material Resources). It is therefore required to have the possibility to import into Synchro Con...
Thibault Dumas almost 3 years ago in SYNCHRO Control 1 Future consideration

To be able to visualize in Synchro Control \ Schedule the Predecessors and Successors of a Task and to navigate between them.

As in Synchro 4D Pro to have the possibility when selecting a Task to view in Synchro Control \ Schedule the Predecessor(s) and the Successor(s) of the selected Task. When a task has been selected and its Predecessor(s) & Successor(s) displaye...
Thibault Dumas almost 3 years ago in SYNCHRO Control / Models 1 Future consideration

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy - by adding the required inspections to the items / tags. Currently the WBS shows the parent / child / items so work scope; post import is not visi...
Guest over 3 years ago in SYNCHRO Control / Inspection 0 Planned

growth simulation to follow 3D path (or polyline)

eg. centerline of pipe, building facade, or curved road
Kate Hester over 7 years ago in SYNCHRO 4D Pro 0 Future consideration

Incorporation of an "Undo" feature within the measurement tool

incorporate an "undo" button while you are using any of the civil tools. For example, being able to use the "station/Offset" tool 10 times and only "undoing" the last 3 measurements taken instead of all the 10.
Tony Bonacorsi about 1 year ago in Field / Models | Tools 1 Future Consideration