Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1042

Easier Location of equipment using synchro field

In a big site where you have thousands of supports, piping and cabinets in various floors, It is practically difficult locating installed equipment on site. as the equipment are only liked via schedule, because everything is greyed out, you don't ...
Gareth Odiakose about 1 year ago in Field / Status update | Tasks 0

Traceability of changes on usage page

The engineers and finance teams wants to know who made any changes to Cost code through usage page after the docket have been received. Currently Synchro tracks any changes done on docket but doesn't have any functionality to check if any changes ...
Siddharth Sahare about 3 years ago in EVM (Perform) / Resource Management 1 Future Consideration

Cost Comparison Report for Suppliers RFQ Response

Once Received RFQ response from Suppliers, the Cost Variant data should compare and generate the Cost Comparision Report. This report is useful to conform the correct suppliers and also selected suppliers profiles for QTY, Cost, all etc.
ASHWIN RAJESH K about 2 years ago in Contracts 0

Form Definitions [Groupable & Collapsible]

Preconstruction Forms should be in the list of Forms, but under a group/heading called Preconstruction that can be minimized. This will prevent having a long list of Forms to look through.
Derryl Acosta about 4 years ago in SYNCHRO Control / Forms 0 Future consideration

enable transitions in offline mode

Some activities like inspections or witness poitns rely on multiple users beign on site and carrying an inspection. If satisfactory they will sign/certify the fact and can transition the flow between each other to do that. In offline mode this is ...
Kiril Tasev about 3 years ago in Field / Forms | Inspections 0 Future Consideration

Increase information stored in QR Codes

Currently QR Codes have a 255 char limitation. Alstom have requested/highlighted the need to have an increase in data stored within - Upto 16 columns within the QR Code.
Bernhard Budiono about 2 years ago in EVM (Perform) / Resource Management 1 Will not implement

Ability to preview Forms in different layouts

The following used to be an option which was at some point removed -
Arpit Prakash about 2 years ago in SYNCHRO Control 0 Future consideration

Option to attach additional document in the pdf document in Synchro field during Mark up.

No description provided
Guest about 4 years ago in Field 1 Future Consideration

Digital Signature service workflow improvement

Currently, a user who needs a digital signed document must use a signature service, such as Docusign, to start the process, export the document, email,/share document with owner, contractor. Owner/Contractor must download certified document, uploa...
Kerry Newbanks about 1 year ago in SYNCHRO Control / Forms 0

Filter columns in Control by multiple values

An example would be selecting multiple options under Status (Inreview & Approved) to exclude the ones we don’t want to see
Thomas Schimpf about 3 years ago in SYNCHRO Control / Reports 0 Future consideration