Project schedule in Control is not matching 4D Pro. It seem to be showing the planned date in Control, rathe then the Actual date. I checked on another project and seen the same behavior. This user is obviously expecting to see the same Gantt/sche...
please, consider expanding on the data types of existing controls or adding new controls. Few needed on our project: Number type in drop down control. This allows data from cascading lists to be used in math operations Link (url) control (i believ...
Keep colors assigned in validation feature for query assignment of cost codes.
Need to have the capability to assign colors to cost codes assignments in Quantity Takeoff view and toggle back and forth from red/green/gray view. It is difficult to determine if query selected elements are listed in the correct property provided...
David Gallaher
over 2 years ago
in SYNCHRO Modeler
0
Needs review
Have the capability to setup the default location for the QR code stamp in plan set module. Also have the capability to stamp all Plan sets at one time or selected range, draft or published status, etc.