PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1323

separate 3D view selected objects

We often use the 3D subdive window not to cut objects, but to see which objects are selected. You can also use filters for this, but if you want to see the linked objects (task with assignments) for each task, setting filters is too much work ever...
Martijn Querner about 1 month ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0

Add a Data Center in Latin America

For South American countries, the closest Data Center is East US. The incorporation of a Data Center for this region is urgently needed (Azure has a Data Center in Brazil, right?), since the collaborative work based on the SYNCHRO Control cloud pr...
Jean Delgadillo over 1 year ago in SYNCHRO Control / Admin 1

Supply Chain Implementation

Add in the full bidding cycle into Synchro, add in the following: Pre-Bid - Bid invitations, Invitations to Bid, Custom Bid Forms(Cost and Schedule), Add Deliverables Management or ProjectWise direct connection for drawings/spec upload Bidding - S...
Guest over 2 years ago in Contracts 2 Planned

Ability to bulk upload Actions/Scripts through Excel

No description provided
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms / Inspection 0 Planned

User History in Resources Status from SYNCHRO Field

When working with SYNCHRO Field, multiple users can update Resources Statuses from the field. Subsequently, all updates that these users make are visible in the Resources Properties > Status > History window of SYNCHRO 4D Pro. However, only ...
Jean Delgadillo over 1 year ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0 Future consideration

Contractor RFI Usage

It would be ideal be able to select the contract package and RFI is associated with. IE: SC01 - Civil Site, SC02 - Foundations, SC03 - Electrical, and on the RFI number it could be auto numbered as RFI-SC01-0001, RFI-SC02-0001. Allowing Contractor...
Guest over 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Make it available to Download and Print Multiple Plan Set Pages at once by putting a box next to the page and checking off the Page wanting to Print.

Make it available to Download and Print Multiple Plan Set Pages at once by putting a box next to the page and checking off the Page wanting to Print and download. Right now there is now way to Download multiple Plan sheets at once. See Attached Sc...
David Dudek 4 months ago in SYNCHRO Control / Plan Sets 0 Likely to implement

Ability to maintain folder mapping for PDF export through Forms Workflow

If a PDF is set to auto-export at a specific folder location within Documents, using Forms > Workflow > Transition, that path is not maintained through provisioning to a production project.
Arpit Prakash 8 months ago in SYNCHRO Control 0

Civil Design Validation and Analysis: Enable read-only view of Superelevation Analysis Result

As a user, I want to view Superelevation Analysis Results in SYNCHRO Field.
Luke Read 3 months ago in Field / Models | Tools 0 Future Consideration

Civil Design Validation and Analysis: Enable read-only view of Corridor Analysis Results

As a user, I want to view Corridor Analysis Results in SYNCHRO Field.
Luke Read 3 months ago in Field / Models | Tools 0 Future Consideration