Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1285

Ability to move files seamlessly between PW and Control > Documents

No description provided
Arpit Prakash over 1 year ago in SYNCHRO Control / Documents 0 Future consideration

Ability to bulk update Document Folder Access

Currently, the way this is set up is to remove access for one Role, all other Roles need to be given access, by manually checking on each. If we had a bulk update option, it will be easier to simply remove the restricted users.
Arpit Prakash over 1 year ago in SYNCHRO Control / Documents 0 Future consideration

Ability to receive periodic reports of Forms assigned to a user

Admin should be able to specify which Form types should be part of a daily report, that gets sent out periodically to the assigned users.
Arpit Prakash over 1 year ago in SYNCHRO Control / Reports 0 Future consideration

Downloading folder and subfolders

When selecting a parent folder should i not get all the subfolders and files? Currently, when I select a folder from the document I'm only getting 1 folder and non of its subfolders and files
Dan Sheldon almost 4 years ago in SYNCHRO Control / Documents 0 Future consideration

Functionality for User Fields when using iModel connectors

When a 3D model is imported directly into a Synchro Control project within the Synchro 4D Pro application (using File > Import), it is possible to create user fields. For example, I could import a 3D model and then I could set up a User Field c...
Ruth Fuller over 1 year ago in SYNCHRO Control / Models 0

Work Area Tool Start Location should have option to use project stationing

Right now the tool always starts at zero, however, this may not be the desired project stationing. Eg. Start Station property is 499+99.1 in the following Alignment - It would be ideal to give users the choice.
Arpit Prakash over 1 year ago in SYNCHRO Modeler 0 Needs review

Synchronization of tasks from .sp files schedules by Task ID without use of GUID.

In the settings menu there is an option for Primavera P6 to use activity IDs for synchronization. The same option for Synchro .sp files (and other formats) would be very useful as synchronization from external data goes through GUIDs by default. B...
Varvara Kleshchevnikova about 3 years ago in SYNCHRO 4D Pro / Integrations 0 Future consideration

Survey Control - control if voting buttons are selectable by user

To further enhance the capability and useability of the Survey control we found a need to have control over the voting buttons. A property attached to each voting button can enable or disable that button to be selectable by the end user. At the sa...
Kiril Tasev 11 months ago in SYNCHRO Control / Forms 0

[07] Progressing Task

Need to able give progress on task level in the Field App.
Guest over 3 years ago in Field / Status update | Tasks 0 Planned

Synchro Forms please add signature Component within Grid Control

Please provide the ability to add signatures within the grid box
Keith Anthon almost 2 years ago in SYNCHRO Control 0 Will not implement