PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1309

Cross section selection tool on other views

It can be hard to select lines, items or layers in congested areas of the model. Especially when you have big ol construction fingers. It would be very helpful if the Cross-section selection tool was available on all views for easier model selecti...
Thomas Schimpf almost 2 years ago in Field / Models | Tools 0 Future Consideration

Being able to add KMZ file to a individual form

Being able to add KMZ file to a individual form
Misti Daigle 6 months ago in SYNCHRO Control / Forms 0

Add support for BCF

https://en.wikipedia.org/wiki/BIM_Collaboration_Format
over 5 years ago in SYNCHRO 4D Pro / Integrations / SYNCHRO Open Viewer 3 Future consideration

Able to do Concatenate Some Bindings to a Target Binding

User want to have the function that able to Combine value from some different binding to another single Target Binding. Example to Combine generate single Document Number from different field.
Indrawan Wijaya almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

In resource Usage Matrix freeze column up to rate code

Hi currently the resource usage matrix has column frozen until Row Total, can the columns freeze be until Rate Code
Nageshwar Sesetti over 2 years ago in Perform / Timesheets 0 Future Consideration

[07] Progressing Task

Need to able give progress on task level in the Field App.
Guest almost 4 years ago in Field / Status update | Tasks 0 Planned

Synchronization of tasks from .sp files schedules by Task ID without use of GUID.

In the settings menu there is an option for Primavera P6 to use activity IDs for synchronization. The same option for Synchro .sp files (and other formats) would be very useful as synchronization from external data goes through GUIDs by default. B...
Varvara Kleshchevnikova over 3 years ago in SYNCHRO 4D Pro / Integrations 0 Future consideration

Reduce Bindings in Form designer to system and form specific ones only

When creating forms or workflows, the system shows all bindings per form type. It is unnecessary clutter and hard to navigate to the ones actually specified for the form in question. This leads to longer times developing forms and increased testig...
Digital Field 12 months ago in SYNCHRO Control / Forms 0

Within the PDF Plan sets text search

I would like a "google" like search of all the text to locate street names and lot numbers across the PDF set. I would like to search for the matching sheets and when in the sheet see the matching text strings
Bill McNamara over 4 years ago in SYNCHRO Control / Plan Sets 0 Already exists

Add Contingency Transfer (CT) to contract (similar to Change Order)

CT is a line item in the SOV that is already funded and is used to cover the cost for unforseen conditions. This is not added to the contract or SOV as it is already a line item but the CT would document the use of these funds.
Scott Musheff 6 months ago in SYNCHRO Control / Admin 0