Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1286

Additional Weather Parameters

I would like the weather widget to capture additional weather parameters, such as Humidity, Visibility, Precipitation Amount and Wind Direction.
Guest almost 3 years ago in SYNCHRO Control / Forms 0 Future consideration

How to format text eg. Underline and bold heading in daily report section 7?

No description provided
Brendan Pilmore 5 months ago in Perform 1

Display Photo Count within Media Indexing

Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
Guest about 3 years ago in SYNCHRO Control / Media Indexing 0 Future consideration

Synchro 4D Pro Gantt and EVM configuration improvement

As per Arpit's response, none of the features required below are possible in Synchro, it would be a meaningful improvement if Synchro aspires to be a tool to be used for construction/planning management rather than only 4D: Hi, I'm trying to do so...
Rafael Vendrame 5 months ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0

Searching / Filter in Help

In 4D Pro help, when we do search it takes long time. This happen in build 6.5.3.7
Indrawan Wijaya 5 months ago in SYNCHRO 4D Pro 1 Will not implement

How to determine which element of the model the task is assigned to?

By clicking on a task in the diagram, we see only the assignments of the task, but we do not understand which elements it is assigned to. Perhaps you should add the function of displaying only the elements assigned to the selected tasks (isolation...
Guest over 3 years ago in SYNCHRO Modeler 0 Planned

Can Due Date on form be defaulted to TODAY()+X number of days?

By default can the due date be "X" number of days from the date the form was created?
Dan Sheldon over 1 year ago in Field / Forms | Forms 1 Will not implement

The Map Layers doesn't support weather

Would like to be able to see Radar and other map-related weather items as you can see in the Map view in Control. This is needed to attach to forms to show why a delay may have happened
Dan Sheldon over 1 year ago in Field / Forms | Forms 0 Future Consideration

Possibility for Administrator to define a default predefined playback review period for Synchro Control \ Schedule.

Currently in synchro Control \ Schedule the animation is starting at the Project Start Date. Meaning that if the entire EPC schedule has been imported and only the Construction phase is animated (i.e. has been mapped to the 3D Model), User will h...
Thibault Dumas almost 3 years ago in SYNCHRO Control 1 Future consideration

Delete or reassign multiple costs at one time

Current way to delete cost code is by a single element. Need the capability to reassign multiple or delete to maximum time. It would be frustrating to delete and then reassign codes if there are thousands of elements.
David Gallaher over 1 year ago in SYNCHRO Modeler 0 Future consideration