PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 478

Layouts and speed

Hi, Would be great when alternating Layouts the speed would also change. Perhaps make it optional to store or not the speed…
Guest over 4 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Future consideration

Constants to work on Filters

Hi I would like to be able to use a Constant to Filter Tasks and 3D simultaneously.
Guest over 4 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

Easier way to export frames with timeline

User is working on a large project and it is a requirement for them to export 4D snapshots from different areas using the same animation timeline. In one animation, they have timeline generated with weekly keyframes, and they need to export a set ...
Guest over 4 years ago in SYNCHRO 4D Pro / Animations 1 Future consideration

Ability to load multiple projects through Power BI Connector

Currently, I can only load one project at a time - If i want to aggregate data from multiple projects, and I run the Connector, it will create duplicates of the existing tables with a suffix (Query1, Query2, etc.), which becomes very hard to merge...
Arpit Prakash over 2 years ago in SYNCHRO Control 0 Future consideration

Using Synchro script to create Resource Groups based on UF values in the same way as creating Activity/Resource Codes, which is already possible.

No description provided
Brigt Rykkje over 4 years ago in SYNCHRO 4D Pro 0 Future consideration

PDF version compare in order to view sheet to sheet or older versions and not just to the current.

Some organizations use sperate existing layout sheet and proposed layout sheet, I want to able to compare the two different sheets. When multiple revision sheets exist for a single sheet, I would like to be able to compare the revisions, i.e. vers...
Kerry Newbanks over 2 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Create actions based on multi assign

Multi Assign is bound to 'Assigned Users', but we cannot create actions from that binding. We would like to be able to do so.
Arnar Agustsson over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Permissions based on status in the workflow

It should be possible to define permissions based on status in the workflow. So for example when an issue hits a specific status only certain roles are allowed to modify, while though still being visible to other roles.
Arnar Agustsson over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

See Cost Codes in Control

Want to see Cost Codes assinged in Modeler in Control on the elements
Dan Sheldon over 4 years ago in SYNCHRO Control / Models 0 Future consideration

SYNCHRO 4DPro / Forms do not include the delivery of Inspection Forms

Inspection requirements, although populated in SYNCHRO Control - does not show in Forms within SYNCHRO 4DPro. Note - SYNCHRO Custom Forms do show in 4DPro. Is this worth pursuing with all the changes going ahead?
Guest over 2 years ago in SYNCHRO Control / Inspection 0 Future consideration