Ability to record Map location in a Form while offline
As an infrastructure inspector working in remote areas, I want the mobile app to automatically capture and store my precise GPS coordinates within my inspection forms (even without an internet connection), so that I can provide verifiable data and...
Options to customize the table part of the Gantt window accessible from Synchro Control \ Schedule
Necessary to have the possibility to view in 4D Review the same layouts as those which have been defined in Synchro Pro.
These layouts must include :
- Schedule Tasks Group and Sort,
- Schedules tasks filters,
- Relevant Schedule Tasks Attrib...
Provide an integration with the screen capture capability of a mobile device to save captures to Field Documents folder or connected PW folder. Current workflow of user takes a screen capture then must go into device gallery and manually move scre...
Improving behavior in SYNCHRO Filtering on Work Screen
Current Filtering Behavior in SYNCHRO Work Screen At present, when users attempt to filter on the Work Screen in SYNCHRO, they must manually click back into the white input box (e.g., next to "Closed") for the filter to activate. This behavior is ...
Background: In our MTR workflow practice, we have some compliance rules for contractor to follow, e.g. in Reports,
MTR project team should generate and submit the report for contractor to review.
After that, contractor should review the report...
Hi, Following the recent update, we noticed that the Project ID is no longer visible in the project details. We would appreciate it if this could be reinstated, as it is important for our work.
Ability to select and move multiple pages in plan set config
We update plan sets as new sheets are prepared. These may not necessarily fall in sequence after the existing sheets, which is where all drafh sheets land by default. So we have to move 50-100 sheets to their correct location in the set. Currently...