Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1322

Ability to view and Markup PDF's attachments

Within the Completions app it would be good if we are able to access PDF's which are contained with a IWP. It would also be useful if you are then able to markup the PDF and the marked up PDF is saved with the related IWP
Guest about 6 years ago in SYNCHRO Control / Forms 0 Future consideration

Mapped Master Dataset for forms

Would like to see a Master dataset hosted via Excel spreadsheet (or similar) that contains all Master data for a Control project and specifically the information commonly referenced via dropdown lists and pick lists on custom forms. Suggested that...
Matthew Blake almost 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Ability to change Status of all Related Forms in bulk

Eg, if there was an observation created, which was escalated to an Issue, which became part of a Change Order (in SYNCHRO Cost), and once the change order is accepted/ closed, the user should get the option to apply a similar status of all the rel...
Arpit Prakash almost 2 years ago in SYNCHRO Control / Forms 0

Additional Weather Parameters

I would like the weather widget to capture additional weather parameters, such as Humidity, Visibility, Precipitation Amount and Wind Direction.
Guest over 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Ability to change status of more than one form at a time

Having to manually turn each form from published to draft just takes too long
Guest almost 4 years ago in SYNCHRO Control / Forms 2 Future consideration

To apply to the 3D Window of Synchro Control \ Schedule the same 3D Filters than the one(s) activated at the time of the upload of the .sp file.

As an example, User would like to filter all 3D Objects not assigned to a Schedule Task (through corresponding Material Resources) prior to share the .sp file with stakeholders of the project through Synchro Control \ Schedule, so that unmapped 3D...
Thibault Dumas over 3 years ago in SYNCHRO Control / Models 0 Future consideration

Possibility for Administrator to define a default predefined playback review period for Synchro Control \ Schedule.

Currently in synchro Control \ Schedule the animation is starting at the Project Start Date. Meaning that if the entire EPC schedule has been imported and only the Construction phase is animated (i.e. has been mapped to the 3D Model), User will h...
Thibault Dumas over 3 years ago in SYNCHRO Control 1 Future consideration

SYNCHRO Field - Documents - search button

It would be great if we can have the search function for documents within SYNCHRO Field. We have a client who is about to upload approx. 100 pdfs per day in Control-documents, pdfs which will be opened by inspectors on site. Imagine someone on sit...
Alexandru Buzan almost 4 years ago in SYNCHRO Control / Documents 4 Future consideration

Model view - Don't show Work Assigned panel in Model View for Guest Users

When a Guest User logs into construction.bentley.com to view the 4D model they have to click on the Model icon in the top right corner to load up the 4D model. When the model loads up, the bottom half of their screen shows a panel that lists out w...
Ruth Fuller over 1 year ago in SYNCHRO Control 0

Graphical Bugs During Animation in Render Mode

When animating an object that fades out while passing through another object, the intersecting object (the one through which the fading object passes) becomes unexpectedly transparent and casts unusual shadows.
Viacheslav Buhaienko 6 months ago in SYNCHRO 4D Pro / Animations 0