Transfer iModel and related data from Project Wise to Control
To be able to transfer an IModel that has been linked on ProjectWise to a Control Project without loosing ALL Connections that were made in 4D Pro and/or Modeler
allow full name of forms to be displayed when making choice from "Work" menu on the left.
Further to Case CS0187259. Currently, when user clicks on the Work menu item a list of available forms is displayed. This list is shown in static width floating window, therefore longer form names are truncated. It is imperative for the user to be...
In 'Assign To' it would be nice to have the users and the roles grouped together. For exampel 'Role: Contractor' and then underneath that all the users in that role, and then the next role with associated users underneath that and so on... If impl...
Morten Sørensen
almost 3 years ago
in SYNCHRO Control / Forms
0
Future consideration
Project Location - Import project boundary from CAD file
User asked if a function to import the project location from a CAD drawing can be added to Project Location setup page. Basically import the boundary rather than drawing it on the map. It would be helpful for very long linear projects.
Alexandru Buzan
over 4 years ago
in SYNCHRO Control / Admin
0
Future consideration
When I create an issue in an synchro control project using the desktop software, I would like this issue to come visible in the browser based system too and vice versa.
Guest
over 4 years ago
in SYNCHRO Control
0
Future consideration
Associate multiple map locations and model locations with one form
Hello - nysdot mentioned it would be nice to have the capability where multiple map locations and/or multiple model locations can be added to the same single form
Showing and hiding the button in the SYNCHRO Control Portal
The ability to show and hide the buttons on the left hand side of the portal. We are using SYNCHRO Control to involve stakeholders without having to install the SYNCHRO Open Viewer. We are not using documents, forms, inspections or dashboards in t...
Stephan Klotz
over 4 years ago
in SYNCHRO Control / Admin
0
Future consideration
Users feedback that there are too many notifications received as user will receive notification for each task assigned to them plus the reminder on the pending tasks. Possible to group the notifications into one per project per day or one notifica...