PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1340

Option to Search and Filter Categories and Model

In the Model viewer, it would be extremely useful to be able to search in the Category and Model trees and turn on/off specific Categories or Models. This functionality exists in Control.
Ariel Froerer over 2 years ago in Field / Models | Visibility 2 Planned

Improve cost codes (from Modeler) in 4D Pro

Cost Codes in 4D Pro The cost code information comes in the following format, which is not usable at all. How do I aggregate the quantities at Task level? One suggestion could be to have the following setup - User Field Value Cost Code 1 23560.1 C...
Arpit Prakash 4 months ago in SYNCHRO 4D Pro / Cloud-hosted Control projects / Import/Export 6

To have the possibility to define a look-ahead filter for the Gantt window accessible from Synchro Control \ Schedule

Currently all Schedule Tasks within the Synchro 4D Pro .sp file are displayed in the Gantt Window accessible from Synchro Control \ Schedule. As we can have several thousands of Activities, it will be difficult for User to understand which are th...
Thibault Dumas over 3 years ago in SYNCHRO Control / Models 1 Future consideration

Delete Bindings

Want the ability to Delete a Binding(s) that are unused and unassigned on FORM Definitions
Derryl Acosta about 4 years ago in SYNCHRO Control / Forms 2 Planned

Size of Survey photo in pdf export using custom layout is small

Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0

Display Resources Tree in Synchro Control \ Schedule

To have the possibility to access in Synchro Control \ Schedule the Resources Tree as defined in Synchro Pro. With possibility, in Synchro Control \ Schedule, to navigate between Resources window, 3D window and Gantt window the same way than in Sy...
Thibault Dumas almost 4 years ago in SYNCHRO Control / Models 1 Future consideration

IFC Export

Hi the IFC export is very limitign: Only ifc 2x3 can be exported The PropertySets disappear and the ObjectTypes are not exported in the right way. I kindly ask you, to improve the IFC export as this file format is very popular and regularly used f...
Manuel Kraehenbuehl over 2 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Ability to export Binding list for all Forms/Inspections in the project

Currently, we have to go Form by Form to export a list of Bindings, which is required for Power BI integration. We can add an option to export for all projects here -
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0

Math Function in Data Grid

It is good if the Math function is available inside the data grid component. Also with Total row.
Indrawan Gmail about 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Improve naming of split objects created by Modeler

Currently names of the 3d objects are not informational and cause inconvenience for distinguishing them. Instead of naming all of them WorkAreaDetailingElement, it may be better to name this split objects by concatenating the inherited original ob...
Jacqueline Chen over 4 years ago in SYNCHRO Modeler 7 Future consideration