Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 239

Constants to work on Filters

Hi I would like to be able to use a Constant to Filter Tasks and 3D simultaneously.
Guest almost 4 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

Easier way to export frames with timeline

User is working on a large project and it is a requirement for them to export 4D snapshots from different areas using the same animation timeline. In one animation, they have timeline generated with weekly keyframes, and they need to export a set ...
Guest almost 4 years ago in SYNCHRO 4D Pro / Animations 1 Future consideration

Using Synchro script to create Resource Groups based on UF values in the same way as creating Activity/Resource Codes, which is already possible.

No description provided
Brigt Rykkje almost 4 years ago in SYNCHRO 4D Pro 0 Future consideration

Allow custom shapes under 'Create 3D'

Allow more free design of shapes other than box, sphere and cylinder
Guest almost 4 years ago in SYNCHRO 4D Pro 0 Already exists

Import baselines created in P6 to Synchro

User creates multiple baselines in P6 and exports them as XML. He import P6 XML but he can't see baseline list in Synchro's Baselines and Scenarios window. User request this feature.
HoSang Jeon almost 4 years ago in SYNCHRO 4D Pro 0 Will not implement

Bulk convert Filters to Resources

It would be great if it was possible to convert all 3D filters to resources automatically. Then all Search Sets within Navisworks would convert directly to Synchro resources. It's possible to do manually currently.
Guest about 4 years ago in SYNCHRO 4D Pro 0 Future consideration

After exporting Dynamic clash detection reports, both objects which have been clashed should show completely in the report, as we have made a single resource before assigning to the task.

Because when we will see the reports we can clearly relate the Collison in our mind that what will be happened at site, if both objects will clash during erection at any point but if only an individual object which comes in the first contacts with...
Vikash Singh about 2 years ago in SYNCHRO 4D Pro / Import/Export 0

Resource Planning & Physical Quantity and Resource Dependent Duration Type

I suggest to put into use one more way to calculate the task duration for tasks with "Work" Task Type. For this we need to implement one more Duration Type - "Physical Quantity and Resource Units Dependent" and one new parameter of Human Resource ...
Guest about 4 years ago in SYNCHRO 4D Pro 0 Future consideration

Synchro PDF printer and preset paper sizes setup

I believe that it would be really useful if there was a "Synchro" preset PDF printer with the complete range of standard paper sizes and the option for custom ones. Currently, Synchro uses the settings of the printers that are installed in the PC,...
Dimitrios Mitritsios about 4 years ago in SYNCHRO 4D Pro / Printing/Reports 0 Future consideration

For merging 2 SP files. the errors for synchronization option.

I think merging large SP file are common practice, however the merged file is loosing some feature of synchroniztion from option. which needs to be clarified. also the single xml file for the merged SP file when imported from P6 looses the resourc...
sanam Chhodar about 2 years ago in SYNCHRO 4D Pro / Integrations 0 Will not implement