Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1336

Email notifications showing mis-leading information

Ability to change the basic email notification sent out. Currently the email notification includes info like Created by and Created on, which COUNTERINTUITIVELY tells the user who has DESIGNED this form and WHEN IT WAS DESINGED.. instead of showin...
Irena Seleznjova 9 months ago in SYNCHRO Control / Forms 0

Attachments within Transition Button

It would be usefull to have a way to also include attachments, as we do through the normal PDF export (in a folder for attachments), using the transition button in the workflow
Joana Isabel Neves Gomes 9 months ago in SYNCHRO Control / Forms 0 Future consideration

Zip the files auto-exported through Forms Workflow Transition

Currently, the files are exported as per the image below. It should zip only if attachments are available, but just export the raw pdf otherwise.
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 0

Include a Synchro Evacuation Process

This would assist the personnel, specifically the HSSE team on site when there is an evacuation emergency to manage the entire process. Synchro can add features below that can be used during an emergency evacuation: Supervisors seeing the names of...
Kaluba Josephine Changwe 6 months ago in EVM (Perform) / SYNCHRO Perform Mobile 1 Future Consideration

Project wide Forms bindings

We need a project-wide binding that can be assigned values at a project level, and be used across multiple Forms definition/Inspections. This will enable users to re-use repetitive information like Project Details.
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0

Form interface in 4D should upto date with Form capability

Not all Form Capability is shown in the 4D. Example. The Default Value are not showing in 4D when we create a new form. Regards, Indrawan
Indrawan Wijaya 3 months ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0

Ability to map Form binding to project meta-data

This is esp. helpful when setting up a template projects and provisioning them to production. Bindings could be map to project metadata like Project Name, No. etc, and be autofilled in all Form definitions.
Arpit Prakash about 1 year ago in SYNCHRO Control 0

Show Legend based on Appearance Profiles in the 3D Window of Synchro Control \ Schedule

Currently no Legend is displayed in the 3D Window accessible from the Schedule functionality of Synchro Control. As a Synchro .sp file can be related to various subjects: Engineering Steps, Procurement Cycle, Construction Sequences,... As Legends ...
Thibault Dumas almost 4 years ago in SYNCHRO Control 2 Future consideration

Ability to download a previously uploaded cost code excel sheet.

if you have a user who originally created a cost code excel spreadsheet upload, and they leave the company, we have no way to download and/or update the cost code structure without a version of the file. Currently you need the original spreadsheet...
Corey Johnson 10 months ago in SYNCHRO Modeler 0 Needs review

Ability to save and share dimensions/information from Measurement Tools

This would be extremely helpful when trying to convey information between stakeholders and allow for consistent information sharing as it is not always easy to target and select the exact point you are measuring in the model. Having the ability to...
Guest over 2 years ago in SYNCHRO Control / Models 2 Future consideration