Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1301

Update the text of empty state page for some cases.

Currently, if the user: • has all permissions checked in the “Permissions” panel (Permissions.jpg); • doesn’t have imported SoV line items and created PCOs and COs; • has all contracts in the “Draft” state; when navigating to the PCO or CO page, ...
Guest over 3 years ago in Contracts 0 Will not implement

store gps location for as-builts

Want to be able to store the position collected in the field with the design model to show that the item is built or being installed in the correct location. Store this information in as-built iModel layer to show what is done in the field compare...
Dan Sheldon over 3 years ago in SYNCHRO Control / Models 0 Future consideration

Users want the option to simply open the pdf viewer.

Users want the option to simply open the pdf viewer instead of the markup viewer when clicking on the attached pdf or pdf in documents in Control.
HoSang Jeon over 3 years ago in Field / Documents | Documents 1 Already exists

Pop-out windows for 3d iModel and Schedule views

3d iModel window should have a button to pop that window out to place on a second monitor. Similarly for Schedule window, and any other windows that take up a lot of screen space.
Guest over 3 years ago in [Archive] SYNCHRO 4D Review 0

Schedule Month Filter Default

The month filter should open to the current month rather than the beginning or end of the project. This would allow for easier navigation for quick look a heads.
Thomas Whiteley over 3 years ago in [Archive] SYNCHRO 4D Review 0

Log attachments in audit trail

Just like workflow changes, I suggest that attachment changes (uploading, downloading and deleting) should also be logged. Currently there are two audit trail tabs (excluding "all"): workflows and views. If implementing this change, perhaps a new ...
Guest over 3 years ago in Contracts 0 Will not implement

Working with different types of work packages in same work package area

How should we work in synchro with different type of work packages like Construction work packages, engineering work packages, procurement work packages and field installation work package which are usually in same work package area?
Guest over 3 years ago in SYNCHRO Control 0

Remove yellow highlighting of search results in Cost grids.

At the current moment, the search results are not highlighted by yellow fill in Synchro Control grids. (Synchro Control.jpg) But Cost grids still keep highlighting of search results. (Cost.jpg) It is not convenient for cases when user has revision...
Guest over 3 years ago in Contracts 0 Will not implement

Previous Site trello board

Review these ideas when there is a chance.
Jacqueline Chen over 3 years ago in Field / Models 0 Will not implement

Updating messages for attempts of editing rejected / revised COs via URL

At the current moment, the rejected and revised CO will be locked and can't be edited. (Locked page.jpg) If user is on the CO details page of rejected or revised CO and tries to add the '/edit' to the URL, we should return warning message. Warning...
Guest over 3 years ago in Contracts 0 Planned