Events converted to variations typically use a subledger code in an ERP to capture the cost. Adding subledger code as an attribute will create this link.
take measurements and calculate areas while performing an inspecting
as an inspector I use a Wheel measurement device to measure distances and calculate area. I want to be able to use an enhanced GPS device to record these points and display on a map. I should be able to measure along a line (2Pts) measure multiple...
Bill McNamara
almost 6 years ago
in SYNCHRO Control / Maps
0
Future consideration
Add deselect option in resource assignment dialog when objects are already assigned to another resource
Often, you will forget to deselect a 3D object before selecting other objects to assign to a resource. In this case, at the end of the resource assignment wizard there is an option to either unassign the objects already in a resource, or cancel. I...
almost 6 years ago
in SYNCHRO 4D Pro
0
Future consideration
When writing/typing a script, there is only one suggestion displayed when entering the first letter(s).
When entering the first letter(s), there should be a dropdown menu with multiple/all suggestions.
This way scripting will be a lot easier.
almost 6 years ago
in SYNCHRO 4D Pro
2
Future consideration
Backspace /Undo command if mistake made when creating 3D Path Section
When creating a complex 3d path in Synchro, it would be nice to easily backspace a mistake when double clicking the wrong area. Currently have to finish the path then go back delete the Keyframe.
Traffic management is very important, a key point to simulate the traffic in synchro is to use a 3D path, but you can not create and assign 3D paths manually for huge amount of traffic, if you can add the feature to synchro script to auto assignin...
Project Risk Management could be part of the Issues module by adding a Risk entry to the Form.
Project Risk manages 'Risk' to the Project (Schedule), not Safety. Risks found and registered with possible impact to the project schedule is used to plan and mitigate the issue. Data can then be further used to raise ongoing lessons learned . Hap...