There should be an option to sort the selected rows on Bulk Assign page.
Refer attached image. There may be a case where user selects multiple rows on multiple pages for assignment, But before assignment want to review what rows are selected. Currently there is no way other than going thro each page and check. It would...
To have the Security Function Setting per Inspection Type like Normal Form. Right now we only have one security setting for all Inspection Type. Please see snapshot.
Want the ability to create Revisions on Form Definitions [i.e. RFI, Submittals, etc.] Would like to have the option for a Revision Numbering to be Numeric or Letters.
Derryl Acosta
almost 3 years ago
in SYNCHRO Control / Forms
0
Future consideration
currently you can use copy as text/paste as text to copy tasks between 2 separate SP files improvement is to allow users to Copy Task/Paste Task (and all of it's properties) between 2 open SP files
take measurements and calculate areas while performing an inspecting
as an inspector I use a Wheel measurement device to measure distances and calculate area. I want to be able to use an enhanced GPS device to record these points and display on a map. I should be able to measure along a line (2Pts) measure multiple...
Bill McNamara
almost 6 years ago
in SYNCHRO Control / Maps
0
Future consideration
Add deselect option in resource assignment dialog when objects are already assigned to another resource
Often, you will forget to deselect a 3D object before selecting other objects to assign to a resource. In this case, at the end of the resource assignment wizard there is an option to either unassign the objects already in a resource, or cancel. I...
almost 6 years ago
in SYNCHRO 4D Pro
0
Future consideration