take measurements and calculate areas while performing an inspecting
as an inspector I use a Wheel measurement device to measure distances and calculate area. I want to be able to use an enhanced GPS device to record these points and display on a map. I should be able to measure along a line (2Pts) measure multiple...
Bill McNamara
over 5 years ago
in SYNCHRO Control / Maps
0
Future consideration
To be able to customize/add role in the personnel (Resource Group Properties)
It will be good to have the role to be customisable for personnel(under Resource Group Properties) to fit into industry or localisation requirement. For example, we do not have the term call superintendent in our local role and also for foreman, o...
Add deselect option in resource assignment dialog when objects are already assigned to another resource
Often, you will forget to deselect a 3D object before selecting other objects to assign to a resource. In this case, at the end of the resource assignment wizard there is an option to either unassign the objects already in a resource, or cancel. I...
over 5 years ago
in SYNCHRO 4D Pro
0
Future consideration
A button let's say next to the "Bulb" one that will open a pop-up scientific calculator with ability to carry out quick maths. option to copy result to clipboard and paste let's say in a field of a form.
Enable custom email distribution to engage other users with a form. It is difficult for the form originator to forward an item to their cross shift to follow up on. Enabling a distribution / linking for the form requests would enable us to better ...
When writing/typing a script, there is only one suggestion displayed when entering the first letter(s).
When entering the first letter(s), there should be a dropdown menu with multiple/all suggestions.
This way scripting will be a lot easier.
over 5 years ago
in SYNCHRO 4D Pro
2
Future consideration
Project Risk Management could be part of the Issues module by adding a Risk entry to the Form.
Project Risk manages 'Risk' to the Project (Schedule), not Safety. Risks found and registered with possible impact to the project schedule is used to plan and mitigate the issue. Data can then be further used to raise ongoing lessons learned . Hap...