PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1304

When accessing the model/marking up the model in work packaging, have components properties show when component is selected

i think with work packaging, it would be beneficial that when we access the model, mark the location, and create markets, the user to see the properties as they select components. that way the planner can mark up the model screenshots with the cor...
Doug Theret about 4 years ago in SYNCHRO Control / Models 2 Planned

Bulk convert Filters to Resources

It would be great if it was possible to convert all 3D filters to resources automatically. Then all Search Sets within Navisworks would convert directly to Synchro resources. It's possible to do manually currently.
Guest about 4 years ago in SYNCHRO 4D Pro 0 Future consideration

Drag and Drop Feature for File Attachments

The ability to drag and drop files as Attachments within Forms
Derryl Acosta about 4 years ago in SYNCHRO Control / Forms 1 Future consideration

Resource Planning & Physical Quantity and Resource Dependent Duration Type

I suggest to put into use one more way to calculate the task duration for tasks with "Work" Task Type. For this we need to implement one more Duration Type - "Physical Quantity and Resource Units Dependent" and one new parameter of Human Resource ...
Guest about 4 years ago in SYNCHRO 4D Pro 0 Future consideration

Synchro PDF printer and preset paper sizes setup

I believe that it would be really useful if there was a "Synchro" preset PDF printer with the complete range of standard paper sizes and the option for custom ones. Currently, Synchro uses the settings of the printers that are installed in the PC,...
Dimitrios Mitritsios about 4 years ago in SYNCHRO 4D Pro / Printing/Reports 0 Future consideration

Filter to User List

In Form, we have user list component. This component show all users. Project user list can be up to hundreds users. So there is requirement to able to filter the user list. Example: just show ten users from other list or user by role or user by ca...
Indrawan Wijaya over 4 years ago in SYNCHRO Control 1 Future consideration

Copy Role from other Project

Able to copy role from other project
Indrawan Wijaya over 4 years ago in SYNCHRO Control / Admin 1 Already exists

After exporting Dynamic clash detection reports, both objects which have been clashed should show completely in the report, as we have made a single resource before assigning to the task.

Because when we will see the reports we can clearly relate the Collison in our mind that what will be happened at site, if both objects will clash during erection at any point but if only an individual object which comes in the first contacts with...
Vikash Singh about 2 years ago in SYNCHRO 4D Pro / Import/Export 0

Indicators for active users in Control to feature collaboration on construction projects

I'd like to propose "active user indicator" bubbles in Control to display users who are currently working in/ logged into Control. This emphasizes the fact that folks are collaborating on construction projects. This is also good to include in the ...
Jacqueline Chen over 4 years ago in SYNCHRO Control / Admin 0 Future consideration

No Access on Documents>Files>Folders

Would like to have an option of No Access when setting up individual folder access Permissions
Dee User List Acosta about 2 years ago in SYNCHRO Control / Documents 0 Future consideration