Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1316 of 1316

A New Task Filter Allowing You To Filter Based On Assigned Resources

We require this feature because we need a quick way of filtering tasks without/with any resources assigned after doing a programme synchronisation. Currently the only way to do this is by filtering the resources manually, however, when you import ...
Daniel Clayson about 3 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

Anchoring of Camera with task during animation

It is useful because each time after importing revised or updated schedule with varied timeframe, we have to set camera which is very time taking and repeating. So, if we can avoid it by anchoring the camera with task it would much easier and time...
Vikash Singh about 2 years ago in SYNCHRO 4D Pro / Animations 0 Will not implement

Based on 4D Pro's Task Name when creating a form.

When a user creates a form in 'My work', he wants to create it based on the Task Name of 4D Pro, like Perform. He said that it can be used to input the quantity value for each task in the field.
HoSang Jeon about 2 years ago in SYNCHRO Control / Forms 0 Future consideration

To have performance percentage complete in Synchro

By default the performance percentage complete is built-in in P6, having performance percentage complete in synchro can directly display the percentage of earned value cost / budgeted total cost in a project.
Andy Fong about 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

search bar on selecting org template

It will be better to have search bar to search project while selecting Org Template
Manoj Jamma about 3 years ago in SYNCHRO Control / Admin 0 Future consideration

Test to see if notification is sent

No description provided
Kevin Vivien about 1 year ago in SYNCHRO Control / Inspection 0

Admin transitions

When form is used by users, sometimes there are batch of them that need to be deleted/archived/changed to a specific status. In cases where form is deleted, that leaves a gap in the numbering system and questions further down the line, so it is be...
Kiril Tasev about 1 year ago in SYNCHRO Control / Forms 0

Ability to calculate slice lengths for slices made through Work Area from graphic tool

Currently, the Slice Lengths are only calculated for slices made through Quantity Take-Off View > Slice tools. The slices made through Area Break Down View > Work Area from the Graphic tool do not compute the lengths.
Arpit Prakash about 2 years ago in SYNCHRO Modeler 0 Needs review

Better Connection Between Map and Model Views

I would like for there to be better connections between the Map and Model Views. If the Model is geolocated, it should automatically be connected to the Map View. If I place an issue on said geolocated Model, I should not have to place it separate...
Guest about 3 years ago in SYNCHRO Control / Maps 0 Future consideration

Filtering 3D filter UserFields by value

Hi SYNCHRO team, I have a new idea for the 3D filter by UserField function.When you create a 3D filter by UserField Values you can use the search function to search the right User Fields. After you have created a 3D filter it is hard to find bac...
Stephan Klotz over 5 years ago in SYNCHRO 4D Pro 1 Future consideration