Idea: To integrate with BIM360 - ability to connect Control Documents to Revit design models stored in BIM360 Reason: BIM360 is one of most popular CDE, it would shortened the way to create and update imodels
We have had and will have a few cases coming up where we would like to download the instances that are currently in a form and then be able to upload it into a duplicate form in another project. Currently, we are able to download the blank csv “te...
Hi, It would be very useful if we can save under a Saved View the hidden objects. So basically I hide 3D objects to clear/isolate areas within the model, then I want to save the view and reuse it in future.
Work hours automatically populate when a rate code is inputted
When a worker is sick or on annual leave their hours differ depending on their contract, we would like to be able to input a rate code for a worker and the hours automatically populate based on a predetermined settings linked to their profile or role
Project schedule in Control is not matching 4D Pro. It seem to be showing the planned date in Control, rathe then the Actual date. I checked on another project and seen the same behavior. This user is obviously expecting to see the same Gantt/sche...
please, consider expanding on the data types of existing controls or adding new controls. Few needed on our project: Number type in drop down control. This allows data from cascading lists to be used in math operations Link (url) control (i believ...