Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 509

Revision Control - metadata needed (What rev of inspection)

No revision control for an inspection form i.e. halfway through a project an inspection form requires a change, maybe a new setting, a new question, reference to a new standard etc. - the customer will not know what piece of equipment has been ins...
Beth Buerger almost 2 years ago in SYNCHRO Control / Inspection 0 Future consideration

Revision Control - duplicates can be created

Nothing stops an Inspector from creating a further inspection if it’s been created/started already – or no revision control to show this possible scenario.
Beth Buerger almost 2 years ago in SYNCHRO Control / Inspection 0 Future consideration

Bulk Import - fail help

No assistance from ‘Published’ upon completion of the bulk import, just success i.e. if the import fails there is no help to fix the import worksheets. Would be nice for the user to understand why it failed and give feedback.
John Todd almost 2 years ago in SYNCHRO Control / Inspection 0 Future consideration

Revision Control Upgrade

No bulk importing revision control, this means the import spreadsheet (revisions) will be held outside of the product. Would like to have some type of revision control inside the SYNCHRO web page
John Todd almost 2 years ago in SYNCHRO Control / Inspection 0 Future consideration

move the card to header bar and shrink to save space for more important info

hello - refer to the screenshot.
Shaohua Guan almost 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Improve RG as the concept of Crew

Currently Pro has some advanced features for resource loading, resource usage spreadsheet, etc. To take it to the next level, it would be a good idea to implement RG in a similar as Resources. A thought would be to use RG as a Crew. A crew is a co...
Dimitrios Mitritsios over 3 years ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 0 Future consideration

indicate the escalation info in the pdf report export if one form is escalated to another form

for example, form A is escalated to form B. When form A or form B is exported, it doesn't state the information/statement of this escalation (e.g. form A is escalated to form B) in the export PDF.
Siti Nurhazirah Mokmin over 3 years ago in SYNCHRO Control / Reports 0 Future consideration

direct link between individual model elements to drawings in documents

all elements, if configured, should be linked to live documents on Control when user click on one element, it will take to the right drawing within Control. It could be a tag, an url, or simply the name of the document and stored in the section sh...
Shaohua Guan over 3 years ago in SYNCHRO Control / Models 0 Future consideration

Layouts and speed

Hi, Would be great when alternating Layouts the speed would also change. Perhaps make it optional to store or not the speed…
Guest almost 4 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Future consideration

Constants to work on Filters

Hi I would like to be able to use a Constant to Filter Tasks and 3D simultaneously.
Guest almost 4 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration