Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Search results

Showing 8

Auto-populate secondary cascading list dropdown's when only one option is available

It would be nice to be able to remove 2 unnecessary clicks. Lists are as follows First List > Second List1 > A 1 > B 1 > C 1 > D 2 > E 3 > F 4 > G 4 > H On the First List, when selecting 2 or 3 we would like to remove th...
Caitlin Zeuli almost 4 years ago in SYNCHRO Control / Forms 1 Future consideration

Support for IFC 4 and 4x1

I work with linear Projects. Trains, Roads, Bridges. Most of these Software have recently added IFC support, but only for the schema 4x1 because it's the only one that supports alignments. Please, add it. It's very painful to go back to dwg just b...
Guest over 5 years ago in SYNCHRO 4D Pro / Integrations 2 Future consideration

Give Project Admin More Control over Forms

1. Allow Project Admins/Project Owners/Document Controller to Delete Forms created in error in progress 2. Allow admins to download a list of all Bindings. 3. Delete Binding Created by Administrator4. Have a separate Test Area in Control, within t...
David Dudek Jr. about 2 years ago in SYNCHRO Control / Admin / Forms 0 Future consideration

Issues on grouping WBS schedule in Synchro

I have encounter issues when I want to group my WBS based on work package then followed by WBS Name in Synchro My original schedule is based on Image 1 (From Left) When I did the grouping in Synchro (Image 2 and 3), it showed WBS workpackage follo...
Nabila Shahilla over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Future consideration

Provide static table control

Further to CSPM-I-631: Provide static table control. To show a user defined table. User defined matrix e.g. 4 columns by 8 rows. First row set as table headings. Availability to populate cell data in the Form manager and/or through csv upload. Abi...
Kiril Tasev over 1 year ago in SYNCHRO Control 0 Future consideration

Improve RG as the concept of Crew

Currently Pro has some advanced features for resource loading, resource usage spreadsheet, etc. To take it to the next level, it would be a good idea to implement RG in a similar as Resources. A thought would be to use RG as a Crew. A crew is a co...
Dimitrios Mitritsios over 4 years ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 0 Future consideration

Ability to Group multiple 3D Objects in the 3D Object Window

eg; Level 1 Formwork has 20 objects. For Level 2, Level 1 can be copied and pasted, likewise for Level 3, 4, etc. However with this grouping feature it is currently very time consuming to highlight and rename the pasted objects to then assign to a...
Guest over 4 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Future consideration

Color mode showing 3d filters and apperance profiles

i need to make reports where i want the apperance profiles that i have but filtered down to a 4 week look ahead. currently the only way to show the filtered tasks in the 3D window is to change the color mode. doing this overides the apperance prof...
Guest about 5 years ago in SYNCHRO 4D Pro 0 Future consideration