Enhancement and Customisability of SYNCHRO Notifications

This idea has two parts to it: 1) Enhancement After using SYNCHRO and deploying it for many projects, we realise the pressing need for the following to be available: Notification once a form is overdue Notification to apply to eveyone in the CC li...
Guest over 3 years ago in SYNCHRO Control / Forms 3 Future consideration

Allow SYNCHRO Control forms to attach documents from Sharepoint repository

Many SP users do not like to maintain 2 data repositories, meaning they do not want to copy documents from SP into SYNCHRO document. They want to be able to attach documents residing in SP
Iwan Pribadi about 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Auto-populate secondary cascading list dropdown's when only one option is available

It would be nice to be able to remove 2 unnecessary clicks. Lists are as follows First List > Second List1 > A 1 > B 1 > C 1 > D 2 > E 3 > F 4 > G 4 > H On the First List, when selecting 2 or 3 we would like to remove th...
Caitlin Zeuli over 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Combine Forms

Combine Form 1, Form 2, and Form 3 into one comprehensive report for that day. The Contractor’s Daily Report: Foreman Daily Record Foreman 1 Foreman 2 Foreman 3 Quality Inspector Daily Record Inspector 1 Inspector 2 Inspector 3 Safety Inspector Da...
Guest almost 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Possibility for Administrator to define a default predefined playback review period for Synchro Control \ Schedule.

Currently in synchro Control \ Schedule the animation is starting at the Project Start Date. Meaning that if the entire EPC schedule has been imported and only the Construction phase is animated (i.e. has been mapped to the 3D Model), User will h...
Thibault Dumas over 3 years ago in SYNCHRO Control 1 Future consideration

Ability to filter by WBS and Path

A good WBS is the core to most schedules and the ability to quickly filter by WBS levels or groups is a much used feature in P6 and other scheduling tools I would like to do in Synchro. The current work arounds I use are 1) Manually select the des...
Kristina Henkai over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Give Project Admin More Control over Forms

1. Allow Project Admins/Project Owners/Document Controller to Delete Forms created in error in progress 2. Allow admins to download a list of all Bindings. 3. Delete Binding Created by Administrator4. Have a separate Test Area in Control, within t...
David Dudek Jr. almost 2 years ago in SYNCHRO Control / Admin / Forms 0 Future consideration

Issues on grouping WBS schedule in Synchro

I have encounter issues when I want to group my WBS based on work package then followed by WBS Name in Synchro My original schedule is based on Image 1 (From Left) When I did the grouping in Synchro (Image 2 and 3), it showed WBS workpackage follo...
Nabila Shahilla about 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Future consideration

Provide static table control

Further to CSPM-I-631: Provide static table control. To show a user defined table. User defined matrix e.g. 4 columns by 8 rows. First row set as table headings. Availability to populate cell data in the Form manager and/or through csv upload. Abi...
Kiril Tasev over 1 year ago in SYNCHRO Control 0 Future consideration

PDF version compare in order to view sheet to sheet or older versions and not just to the current.

Some organizations use sperate existing layout sheet and proposed layout sheet, I want to able to compare the two different sheets. When multiple revision sheets exist for a single sheet, I would like to be able to compare the revisions, i.e. vers...
Kerry Newbanks about 2 years ago in SYNCHRO Control / Plan Sets 0 Future consideration