Ability to filter by WBS and Path

A good WBS is the core to most schedules and the ability to quickly filter by WBS levels or groups is a much used feature in P6 and other scheduling tools I would like to do in Synchro. The current work arounds I use are 1) Manually select the des...
Kristina Henkai over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Versions of 3D models in iModel

This idea refers to using Synchro Control with an iModel with Projectwise Connections. When viewing the Connections I think it is essential to be able to see the version of the model, e.g. P03 or C06. The model version isn't listed on the Connecti...
Ruth Fuller about 2 years ago in SYNCHRO Control / Models 0

Give Project Admin More Control over Forms

1. Allow Project Admins/Project Owners/Document Controller to Delete Forms created in error in progress 2. Allow admins to download a list of all Bindings. 3. Delete Binding Created by Administrator4. Have a separate Test Area in Control, within t...
David Dudek Jr. about 2 years ago in SYNCHRO Control / Admin / Forms 0 Future consideration

Add current progress % next to progress bar for each activity in "All Activities" page

This is an idea from our programming team, which they find it very useful if can directly know the progress of each activity, with the aid of filtering function and WBS, instead of going to another page like "Quantity Progress", which doesn't have...
Tat Man Leung about 1 year ago in EVM (Perform) / Program/Schedule Collaboration 0 Future Consideration

Issues on grouping WBS schedule in Synchro

I have encounter issues when I want to group my WBS based on work package then followed by WBS Name in Synchro My original schedule is based on Image 1 (From Left) When I did the grouping in Synchro (Image 2 and 3), it showed WBS workpackage follo...
Nabila Shahilla over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Future consideration

Synchro 4D Pro Gantt and EVM configuration improvement

As per Arpit's response, none of the features required below are possible in Synchro, it would be a meaningful improvement if Synchro aspires to be a tool to be used for construction/planning management rather than only 4D: Hi, I'm trying to do so...
Rafael Vendrame about 1 year ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0

Copying Inspection Form from a Template Project

When Re-provisioning from a Project Template, it does not Copy over Published Inspection Forms. 2. When creating a New Project and using a Template with Inspections, it does not copy Inspection Forms that are Published.
Derryl Acosta over 2 years ago in SYNCHRO Control / Inspection 0 Planned

Linking Forms together - Conditional and non-conditional

As a User, I want to Ad-hoc link forms together with relationships that form larger project workflows. The user should be able to state if they are conditional links (requiring the new forms to be completed before primary can proceed) or non-condi...
Noel Gonzalez-Jones over 2 years ago in SYNCHRO Control 0

Setting for appearance profile behavior for overlapping tasks

When there is one resource assigned to multiple overlapping tasks the behavior regarding which profile should be shown is not consistent. This idea adds a setting that would make it consistent. This is how the setting should work: Scenario 1 Given...
Tom Fry over 1 year ago in SYNCHRO 4D Pro 1

Enable trigger in transition to start Section Collapsed or Open

Simple trigger/tickbox in the status of the flow that allows a Section to be displayed collapsed or open depending on the state/transition. State 1 - collapsed State 2 - open State 3 - collapsed
Kiril Tasev over 2 years ago in SYNCHRO Control 1 Already exists