Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1287

Add Fields to Status Updates

We are trying to track quantities of units installed by our field personnel. It would be great if they could status the task then enter the quantity of material installed. It would be nice if there was a comments field added as well so they could ...
Guest over 3 years ago in Field / Status update | Resources 1 Planned

Equipment library in Synchro control Document

In order to make import of 3D equipments and some basic geometry possible in synchro control project, why don't we add a equipment library by default to documents tab. This will enable user to add required equipment files to itwin bridge seamlessl...
Guest over 3 years ago in SYNCHRO Control / Models 0 Future consideration

Description Field for Form

I feel that we need a description field for a form. Right now we only have form Name. With form description field, we able to give more information / remarks - like what is the purpose for that form and other notes.
Indrawan Wijaya over 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Update Resource Statuses within Control

SYNCHRO OpenViewer can do that and 4D Review/Control is meant to eventually displace that, so makes sense to incorporate this feature. We need to be able to Resource Status directly from within an Inspection/Form iModel attachment. The use case be...
Arpit Prakash over 3 years ago in SYNCHRO Control / Models 0 Future consideration

Metadata

Could the date and creator of Activities / Events be made available on the timeline?
Duncan Turner almost 2 years ago in Perform 1 Already exists

Improve RG as the concept of Crew

Currently Pro has some advanced features for resource loading, resource usage spreadsheet, etc. To take it to the next level, it would be a good idea to implement RG in a similar as Resources. A thought would be to use RG as a Crew. A crew is a co...
Dimitrios Mitritsios over 3 years ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 0 Future consideration

Inspections - auto export completed PDF inspections forms to PW

No description provided
Beth Buerger almost 2 years ago in SYNCHRO Control 0 Planned

Esclating a form from a form

I want to create an issue from an inspection form or observation form
Beth Buerger almost 2 years ago in SYNCHRO Control 0 Planned

AASHTOWare Data sharing

Would love to be able to share data to AASHTOWare from SYNCHRO Inspections. API needed.
Beth Buerger almost 2 years ago in SYNCHRO Control 0 Future consideration

Revision Control - metadata needed (What rev of inspection)

No revision control for an inspection form i.e. halfway through a project an inspection form requires a change, maybe a new setting, a new question, reference to a new standard etc. - the customer will not know what piece of equipment has been ins...
Beth Buerger almost 2 years ago in SYNCHRO Control / Inspection 0 Future consideration