PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1323

Allow bulk update for Plansets sheets

With projects having thousands of sheets added as plan sets. Sometimes it is necessary to update some information on multiple sheets after the sheets are published. For a scenario where, for example, the discipline of 100+ sheets needs to be chang...
Hasham Kiani almost 2 years ago in SYNCHRO Control / Plan Sets 0 Planned

Form Model location should include visibility

Model location should include selection, visiblity, view, basically Model location should behave like Saved View.
Jacqueline Chen almost 4 years ago in Field / Models | Display 0 Will not implement

Bigger image view

When images are attached to forms, they show simply as thumbnails. If the image was displayed in a larger size directly in the form, it would quicken the workpace since you wouldn't have to click into the image to see it fully
Guest almost 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Station offset to overlay with map

Watch this season plan activity: PDCGTM-436Vincas It is a competitor https://instacei.com/home InstaCEI - Highway Construction SoftwareThe essential software for highway construction. Collect, share and act on data real-time from any device, all i...
Jacqueline Chen almost 4 years ago in Field / Models | Tools 0 Will not implement

Extend interoperability from version 15 to version 16

Synchro 4D Pro is currently only interoperable with ASTA Powerproject up t o version 15 of the software. The current version of ASTA Powerproject is version 16.0.02 and any users in this format are unable to import files into Synchro unless they u...
chris horsfield almost 2 years ago in SYNCHRO 4D Pro / Import/Export 4 Will not implement

Display a time period in 3D window

Just like the time period filter for activities it would be helpfull to be able to get the view of all these avtivities in the 3D window, including all assigned equipment resources. So not just a Focus Time, but a Focus Period. This would be very ...
Michiel Janssens almost 4 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Future consideration

Merging work packages

we should be able to create work packages from Synchro 4D pro (via Resource Groups) and see them in the list of work packages in Control. At the moment these two lists are not he same. At the same time, the status update should be available in the...
Francesco Nacci almost 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Under the Documents Module Keyword Search does not work

When I type in the field to do a keyword search, it does not return results based on a keyword
Derryl Acosta almost 4 years ago in SYNCHRO Control / Documents 1 Future consideration

Forms page summary - customization

We can customize the Forms page summary to include any attributes we want which is great, but the second we close and open Control we lose the customization. It would be easier if we can retain the customization. Even more, what if we can define t...
Alexandru Buzan almost 4 years ago in SYNCHRO Control / Forms 1 Future consideration

Ability to load multiple projects through Power BI Connector

Currently, I can only load one project at a time - If i want to aggregate data from multiple projects, and I run the Connector, it will create duplicates of the existing tables with a suffix (Query1, Query2, etc.), which becomes very hard to merge...
Arpit Prakash almost 2 years ago in SYNCHRO Control 0 Future consideration