Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1297

Ability to Remove Physical Object Layers from Model Tree

It would be nice to have the ability to remove these (hide/unhide) from the model tree to simply navigation of the model in the Model Tree. Or just remove them?
Mike Ranney over 3 years ago in [Archive] SYNCHRO 4D Review 0

Drop down option to allow more than 25 forms to be viewed per page.

Our current Projects involve approximately 250+ forms of each type to be completed for installed asset inspections. the ability to have a drop down option at the bottom of each page with options to view 25, 50, 100 or 500 forms at any time without...
Paul Keen over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Dashboard Can Filter by Form

Top part in the dashboard (chart and numbers) can be filtered by Form Name or Form Category.
Indrawan Wijaya over 1 year ago in SYNCHRO Control / Reports 0 Future consideration

Can Due Date on form be defaulted to TODAY()+X number of days?

By default can the due date be "X" number of days from the date the form was created?
Dan Sheldon over 1 year ago in SYNCHRO Control / Forms 1 Already exists

Better Timeline Graphic in Export

I think if the timeline graphic looked better and more up-to-date, at the minute it looks a little more old-school. So I think this would help Synchro Exports looks more professional and lessens the need for external/third party software.
Jake Dyson over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Will not implement

Reference Other Synchro 4D Projects without Importing Them

Where multiple projects are underway across a large campus, often run by separate teams or other contractors, it would be beneficial to be able to reference these as links to a Synchro Project, as opposed to importing them. This would enable other...
Christian McCartney over 1 year ago in SYNCHRO 4D Pro / Import/Export 1

Change the bar style of gantt chart

When we want to close the levels, we want to see bars rather than lines for higher levels. Therefore, there is a need to adjust bar styles in the gantt chart.
Guest over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Display % of planned task progress dynamically, according to current Focus Time

It would be helpful to have the ability to display the task progress dynamically for planned dates, according to Focus Time (progress simulation for planned dates). We would like to produce an animation and indicate in the simulation, what is the ...
Daria Kosmala over 3 years ago in SYNCHRO 4D Pro 0 Future consideration

Downloaded Document

at Downloaded Document, it has Delete button. Actually this delete button will delete the file in Control Document. This can make user miss understand the purpose of this button. Need to have better description for the Delete button and for the Re...
Indrawan Wijaya over 3 years ago in Field / Documents | Documents 0 Planned

When Create a Form, there is Checker to Avoid the Duplicate Form

Hi, I think 4D Pro should have the checker that will tell user the same Workpack is already Exist. Best regards, Indrawan
Indrawan Wijaya over 1 year ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0