Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1342

Include map location in PDF export

Forms export to PDF in Synchro Control does not include map location although model location is included. Form was created in Synchro Field 3.2.0.157. Attachments were ticked in export dialog.
Daria Kosmala almost 4 years ago in SYNCHRO Control / Forms 1 Future consideration

WPS to AWP Battle Board Integration

Use synchro for scheduling to link to p6 Use Csim planner to build IWP Push data to Synchro Control/Field/4D
Ryan Posnikoff almost 6 years ago in SYNCHRO Control 0 Planned

Can not Isolate more than one work areas

Have capability to isolate / focus more than one work area should be good. Right now, we only can isolate one work area.
Indrawan Gmail almost 4 years ago in SYNCHRO Modeler 0 Needs review

Ability to assign grid bound data to fillable PDF for export

Users would like to see reports in the pdf form that they are used to seeing. Therefore, custom export is not preferable over fillable pdf. As of now, I think the data captured via grid can be exported into a standard or custom pdf but not a filla...
Paolomee Udani almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

X-Section Saved View

When I detail (dimension) a x-section view it moves to the next station properly. When I close out of x-sections then log back in the next day I would like it to remember the dimension locations I used and apply again like a saved view.
Guest almost 4 years ago in SYNCHRO Control / Models 0 Future consideration

Fast Option - Selection Level - Include Form

hi Dev Team, Now 4D Pro can access the Form. If can add the Fast Option feature to able to select Form, I think it may give some value. Also if there is any more easy way to see the connection between Form and Task also good. Thank you, Indrawan
Indrawan Wijaya almost 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 1 Will not implement

Rights to assign on users in read-only mode

Hello, We publish a synchro schedule in the Control area, to allow the project team and stakeholdersto view the project. All teammembers have read-only rights. This allows them to view the schedule but unfortunately making use of established filte...
Paul Kramer almost 4 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

ProjectWise document connection Lower connection to Project Level

project framework then project top folders under that it would be good to be able to connect into a lower level of the folder structure so we can connect to areas specific to the control project
Alastair Barbrook almost 2 years ago in SYNCHRO Control / Documents 0 Already exists

Selection when creating a profile

When "Profile" enabled from "Civi Tools", hide or show in transparent the elements that cannot be used to create a profile. Prompt message if nothing can be used in the iModel.
Shaohua Guan almost 2 years ago in SYNCHRO Control / Civil Tools 0

Form template document links

Links and external documents attached to the Template form so when creating a new it has the links predetermined.
Alastair Barbrook almost 2 years ago in SYNCHRO Control 0 Future consideration