Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1342

collapsible sections by discipline in the PDF Settings

Under the All Sheets thumbnails in the PDF Setting have the ablity to collapsibe a discpline down to just a name of sheets to make it easier to move around the sheets. Also give the ablity to search by discipline
Dan Sheldon about 4 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Pre-filled Template in Events (Mobile App)

In the Description section in Event (Mobile app) it would be great if we can have Pre-filled Template so I want the user to have a set list of details to fill in for the description for consistency.
Abhi Kotecha about 2 years ago in EVM (Perform) / Events & Notices 1 Future Consideration

Replace "Contact Administrator" error message with "Clear Local Cache"

Replace "Contact Administrator" error message with "Clear Local Cache" message as a first line of troubleshooting.
Guest about 4 years ago in SYNCHRO Control / Admin 0 Will not implement

When object is selected it highlights tasks associated (Status update view)

When 3D odject is selected in Status view the accosiated task should be highlighted. Similar to when a 3D object is selected in the schedule view in Control.
Thomas Schimpf about 4 years ago in Field / Status update | Resources 0 Planned

Bulk Export PDF Inspection Forms

In the event of large volumes of Inspection Forms being executed daily; the current manual pdf export functionality will slow down the workflow. Suggest bulk PDF Export to be utilized within the Inspections Module.
John Todd about 4 years ago in SYNCHRO Control 0 Planned

Manpower Productivity Report

Based on Project Schedule, allocated manpower and site field tracked Material utilization to find individual or team manpower Productively data. This data useful for further planning in similar work and find good team for productivity. Example:Own...
ASHWIN RAJESH K about 2 years ago in EVM (Perform) 1 Future Consideration

Sub Contractors/ Suppliers Claims and Payment & Claims Progress Chart

Qty and Amount quoted from Sub contractor/ suppliers claiming value should reflect to Budget Total Cost. Example: Work Order Qty:-Supplier Name:xxxNature of work :: Concrete Total QTy : 1000m3Rate:750/m3 Monthly Claiming 2020/08 =12% Cost any Rete...
ASHWIN RAJESH K about 2 years ago in Contracts 0 Planned

Project Sub Contractor dictionary for RFQ

Contractor side have List of Sub contractors/Supplier that all data's should stored and access from Sub Contractor/Suppliers dictionary Option . For Example: In Supplier Dictionary : Name of the Company, Nature of work or Material/ Cost Per , Cont...
ASHWIN RAJESH K about 2 years ago in Contracts 0 Planned

Option for Map integrated 3D Tiles

3D Tiles Map integration enable more realistic map visualizations & very useful for animation in Synchro 4D
ASHWIN RAJESH K about 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0

HDRI Background

HDRI Background color option is very useful to slow realistic view
ASHWIN RAJESH K about 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Will not implement