Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1336

Fast Option - Selection Level - Include Form

hi Dev Team, Now 4D Pro can access the Form. If can add the Fast Option feature to able to select Form, I think it may give some value. Also if there is any more easy way to see the connection between Form and Task also good. Thank you, Indrawan
Indrawan Wijaya almost 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 1 Will not implement

Ability to select similar objects based on properties Control

This feature is already there in Modeler, and would be ideal to have it in Control as well. It could be useful to create saved views based on Workpackage Codes, or any other avaible parameters.
Arpit Prakash almost 4 years ago in SYNCHRO Control / Models 0 Future consideration

ProjectWise document connection Lower connection to Project Level

project framework then project top folders under that it would be good to be able to connect into a lower level of the folder structure so we can connect to areas specific to the control project
Alastair Barbrook almost 2 years ago in SYNCHRO Control / Documents 0 Already exists

Selection when creating a profile

When "Profile" enabled from "Civi Tools", hide or show in transparent the elements that cannot be used to create a profile. Prompt message if nothing can be used in the iModel.
Shaohua Guan almost 2 years ago in SYNCHRO Control / Civil Tools 0

Ability to export user field graph to Excel

In 6.4 now we support distribute (Task) user field over duration and user can choose timescale for such distribution. Users now ask if it would be possible to export the User field graph to Excel so they can further use data from Pro for dashboard...
Dimitrios Mitritsios almost 4 years ago in SYNCHRO 4D Pro / Import/Export / Printing/Reports 0 Future consideration

Summary View does not Work

The Summary view does not work, in the user/project summary non of the custom forms created displays as overdue, close to deadline etc. In the attached screenshot it displays as 0.
Guest almost 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Working in a large project community makes it difficult to find the right person (by name) responsible for task completion within a digital workflow.

Working in a large project community makes it difficult to find the right person (by name) responsible for task completion. Selecting the form 'assigned to' dropdown lists the Roles and Individuals so selecting the right person from 25+ mechanical...
Guest almost 4 years ago in SYNCHRO Control / Forms 0 Already exists

Change Value options in forms

Option to define default results for certian fields in form questions. Example value for a userlist will be current logged in user (Current), or default for a date field would be today (Today)
Guest almost 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Include map location in PDF export

Forms export to PDF in Synchro Control does not include map location although model location is included. Form was created in Synchro Field 3.2.0.157. Attachments were ticked in export dialog.
Daria Kosmala almost 4 years ago in SYNCHRO Control / Forms 1 Future consideration

Form template document links

Links and external documents attached to the Template form so when creating a new it has the links predetermined.
Alastair Barbrook almost 2 years ago in SYNCHRO Control 0 Future consideration