I want to use an Action to create a message in a Form to tell a User to do something without the "Basic HTML alert" popping up in the title of the message.
I want to use an Action to create a message in a Form to tell a User to do something without the "Basic HTML alert" popping up in the title of the message. The Message on the first line: “Construction.bentley.com Says” is meaningless to a message ...
Many Navigator Mobile users want to open and view the linked document when selecting a specific object in the model even in SYNCHRO Field.
This feature is not in the Autodesk app, and Navigator Mobile is not currently under development, so SYNCHR...
Adding ability to format a control -> change style-> choose style would add further capabilities as implementing RAG type notifications or changing colours of not only box (highlight) but control font properties too (changing from white font...
Allow for High Res Photos to be captured in the Docket Form / Mobile App
Requested via https://envisionapp.zendesk.com/agent/tickets/6575 for QBC. Photo resolution in the docket form is significantly worse than the same photo taken within the photo and comments form
Bernhard Budiono
over 1 year ago
in Perform / Dockets
1
Future Consideration
I am trying to download Synchro open viewer, the issue is when I download: Free 4D BIM Model Viewer (bentley.com) It is Version 6.3.2.0 So it will not open my current Synchro 4D PRO models that are created in 6.4.1.2 Please can you let me know if ...
feature able to create a view Eg- a steel fabrication view to be created in synchro pro and uploaded on to synchro control. and in manage role having a feature to give access to only a steel fabricator stakeholder. This will allow the subcontracto...
With projects having thousands of sheets added as plan sets. Sometimes it is necessary to update some information on multiple sheets after the sheets are published. For a scenario where, for example, the discipline of 100+ sheets needs to be chang...
When we do resource progressing, and if we have a Removing Activity, the component geometry is not appear. We need to set the timeline to the task date so we can see the geometric. To help user easily get the timeline for that task, it is good to ...
Extend interoperability from version 15 to version 16
Synchro 4D Pro is currently only interoperable with ASTA Powerproject up t o version 15 of the software. The current version of ASTA Powerproject is version 16.0.02 and any users in this format are unable to import files into Synchro unless they u...