Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1287

Ability to download csv upload template file

We have had and will have a few cases coming up where we would like to download the instances that are currently in a form and then be able to upload it into a duplicate form in another project. Currently, we are able to download the blank csv “te...
Charlie Button about 2 months ago in SYNCHRO Control / Admin 0

Ability to set Today's Date as a Binding in Forms

No description provided
Arpit Prakash 5 months ago in SYNCHRO Control / Forms 0

Related forms to be bound to a specific location or control in a form.

When we relate forms we usually do that for a specific reason or as a workaround to raise a form from within a form. When related currently the forms are showing bunched up together with no sensible order or context. As a user I want to see the es...
Kiril Tasev 6 months ago in SYNCHRO Control / Forms 0

Ability to disable Assign To dialog for specific workflow transitions

This is helpful in instances where the final approval will always be the one that's assigned a closed Form. A good place to disable it would be under Forms > Set workflow > Edit transition button > Advanced > Include comment on transit...
Arpit Prakash 8 months ago in SYNCHRO Control / Forms 0

Automate the process of creating a SYNCHRO/BIC project

No description provided
Arpit Prakash 6 months ago in SYNCHRO Control 0

Enhancement and Customisability of SYNCHRO Notifications

This idea has two parts to it: 1) Enhancement After using SYNCHRO and deploying it for many projects, we realise the pressing need for the following to be available: Notification once a form is overdue Notification to apply to eveyone in the CC li...
Guest about 3 years ago in SYNCHRO Control / Forms 1 Future consideration

Options to customize the table part of the Gantt window accessible from Synchro Control \ Schedule

Necessary to have the possibility to view in 4D Review the same layouts as those which have been defined in Synchro Pro. These layouts must include : - Schedule Tasks Group and Sort, - Schedules tasks filters, - Relevant Schedule Tasks Attrib...
Thibault Dumas about 3 years ago in SYNCHRO Control / Models 1 Planned

Maintain PDF mapping after re-uploading similar pdf with updates

We should be able to maintain the mapping if the fillable fields are the same. This will save much time remapping when small updates (additions/formatting) to the PDF have to be reimported.
Arpit Prakash 8 months ago in SYNCHRO Control / Forms 0

Link between documents under Documents/Connections and plant set

Since we can now display the saved search under Synchro field, it may be easier to find a document under Documents or Connections. From there if the document exist under Plan Set, a Go To link should exist to allow user to move back and forth betw...
Luc Poulin 3 months ago in Field / Documents 1

Display the Resource Statuses in Synchro Control the same way than in Synchro™ 4D Pro

In Synchro™ 4D Pro it is possible to define several Resources Statuses and associate them to a Resource at a defined date. Then, if Color Mode of the 3D View is based on Resource Statuses, when moving the Timeline in the Gantt window of Synchro™ 4...
Thibault Dumas about 2 years ago in SYNCHRO Control / Models 0 Future consideration